Business Type:
Trading Company
Establishment:
2011
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Tianjin Taishouxing Steel Trade Co., Ltd., belongs to Ma Xin Shun steel pipe processing plant, the company specifically set up for the development of the national market, it was established in 2004.Ou...

1
    YRS
General Supplier
Supplier Homepage Home, Lights & Construction Construction & Real Estate Formwork Steel Formwork For Concrete Steel Formwork System Steel Concrete Formwork

Steel Formwork For Concrete Steel Formwork System Steel Concrete Formwork

Get Latest Price
Min. Order / Reference FOB Price
500 SquareMete US $38.00/ SquareMete
Local Area: Beijing, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: TSX
Model Number: concrete forms
Surface finish: painted
Material: Q235 Steel
TSX-MF2002 concrete forms/steel formwork system/steel formwork for concreteFormwork Description
More customized sizes available.Quality control
Qualitycontrol:Qualityistheessenceofanenterprise.OurSOPrequirementcompletethequalitycontrolprocessfrommaterialinspectiontofinalpackingcheckbeforeshipment.
SatisfactoryService:150workers,8engineers'R&Dteam,10QCstaff's,andspecializesalesforcereadytoserveyou.Mutualsuccesswithcustomersisourprioritygoal.Company InformationFAQ
- - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 10-20 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction metal FormworkRelated products
Click Pictures for more information.Contact Us
Contact :Jane Lin
Skype: live:jane_4050
Websit : www.tjtsxgroupe.com
http://tjtsx.en.alibaba.com
Tel: +86(22)83973368-8009
Email :jane(@)tjtsxgroupe.com
Mobile/Wechat/Whatsapp/Viber:+8615888703908
Skan To Add My WechatSkan to Homepage
Welcome to visit our factory at any time!
seline;">Variety of models can customize according to your specification requirement.

Send your message to this supplier

*From:
To:
Tianjin Taishouxing International Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now