we are sheet metal professional manufacturer engaged in precision sheet metal fabrication eg: meter box, cabinet,Bank self-service equipment, ATM machine, Safe cabinet, voltage inverter cabinet, charg...
Min. Order / Reference FOB Price | |
---|---|
5 Piece | US $5.00/ Piece |
Local Area: | Wuhan, Hubei, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | GSD, OEM |
---|---|
Place of Origin: | Shandong, China, shandong, China (Mainland) |
Brand Name: | GSD, OEM |
Model Number: | steel fabrication company, steel fabrication company |
Product Description
Name | Stamping parts;cutting parts;welding parts;auto accessaries;work |
Material | Carbon steel,Stainless steel, aluminum alloy,Brass alloy, copper,Zinc alloy ;SPCC SGCC SGLCC etc. |
Size | Custom.Thickness:0.8mm-8.0mm. Tolerance:±0.01mm |
Surface Treatment | Polishing, Zinc plating, Powder coating, Chrome plating, Nickel plating |
Drawing | CAD, PDF ,3D drawing |
Export Markets | Southeast Asia, Australia,Eurpope, America, Canada, Finland, Russia,etc |
flange parts
deep forming,welding
machining parts
cutting,bending,punching,pressing
all kinds of accessaries
folding,welding,cutting
Detailed Images
Company Information
Packing & Delivery
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent, pls call us or tell us in your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price /confirm/iation, you can require for samples to check our quality. We will provide you sample for free (value under USD15), as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 3-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
4) What about the leading time for mass production?
Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.