ACME Family Use Food Waste Biogas Digester
I.StructureChart
II.IntroductionofHouseholdSoftBiogasDigester
1.Material:
1.Twokindsofmaterialswithdifferentthicknessforyourchoice,
Redmudcompositemembrane:0.5mm,0.8mm,1.0mm,1.2mm,1.8mm.
Highstrengthindustrialpolyesterdampnetcloth:0.8mm,1.0mm,1.2mm,1.4mm.
Duetothechemicalreactionsinthedigesterwesuggestthesecondmaterial.
2.Size,wecanproducedifferentsizesaccordingtoyourneed.Normally,8CBMand10CBMbiogas
digesterwillbeenoughforhouseholdplant.
2.BriefIntroduction:
Thedigesteristeapotshapedwithgasoutlethole,feedinlet,andmaterialoutlet,withpipesassembled.Thediameterofthefeedinletandmaterialoutletbothare200-300mm,bigenoughforthematerialgoesin/outsmoothly.Meanwhilethefeedinletandthematerialoutletarewhole
welded,notboltconnected,whichmakesitmorelightandbettertightness.
Normallythedigestercanbeinstalledundertheground,halfundertheground,orontheground,thatdependsonthe
localenvironment.
3.Advantages:
A.longuselife,normaluseupto15years.
B.hightemperatureresistant(50°C)~(-20°C),acidandalkaliresistant,lightningprotection,earthquake,ripstop,flameretardant.
C.builtpoolfor100%successrate.
D.ventingrateishigh,won'tappearbuildpoolair-leaksphenomenon.
E.highsafety,noclearpool,nohumandangerous.
F.effectivelysolvetheproblemoftheCrusting
G.afterthemoving,canrepeattodisassemblewithonlyair.
H.shorttimelimit,generaljustneed1daycanbuildthepool,andthenextdaycanbeputintouse.
I.specialisthimself,noneedsimplemaintenancecanbegin.
J.builtpool,thegroundisflexible,canbebuiltundergroundpool.
K.butfold,lightweight,easytotransportandthecostsisverylow.
4.TipsforHouseholdBiogasDigesting:
Thematerialfeedofhouseholdbiogasprojectisnormallydividedintotwotypes,oneatatimefeeding(staw),orcontinuousfeeding(animalwasteorhumanwaste).
Takethecontinuouspigmanurefeedinghouseholdbiogasplantforexample(accordingtothedailytemperatureinsouthChina),fora8CBMsoftdigestertheavailablefermentationvolumeisabout6CBM,thenfollowingwillbethematerialweneedtoproductbiogas,
1).1200kgpigmanure(theTotalSolidrateofpigmanureis18%)
2.500kgpreparedinoculum.
3).3300kgwater.
4).Becausethedigesterisinstalledwiththepigpenandthetoiletsothedailyfeedingisautomatic.
Foryouinformation:theInoculumisforspeedingupthebiogasfermentationwhichisrichofMethanebacteriasubstance.Normallycanbepreparedbylocalmaterial,500kginoculumcanbeproducedby250kgsludgeand250kganimalwasteafter10dayssealing.
5.Followingisthepicturesoffinishedbiogasdigesterourcustomersentusforyourreference.
Looking for a qualified biogas project supplier?
ACME isa experienced biogas project supplier, we specialized in this field for many years with high reputation.
-ACMEsupplies whole biogas plan according to your different budget.
-ACME offers the whole set of equipments and installing and after service.
-ACME provides both big biogas project equipments and family size biogas system.
-No matter you are a big investor or a small dealer, please come to ACME, we will offer the most suitable biogas program.
about us:
WUHAN ACME AGRO-TECH CO.,LTDlimited company is located in the nine provinces of the beautiful.
Jiangcheng, Wuhan, the company is now in a number of domestic, international famous food and agriculture colleges, scientific research institutions, the company carried out extensive and in-depth technical and business cooperation, and establish a long-term strategic cooperative partnership.
ACME focus on agricultural machinery, food machinery, bio-energy, agricultural engineering and food engineering etc. After many years’ of development, ACME already had customers from all over the world like North America,South America,Southeast Asia,Africa,Oceania,Mid East,East Asia,Central America etc.. Also we have contracted three sets of rice mill plant for UNDP agriculture project in Benin and projects for others UN agro & food engineerings.