Business Type:
Trading Company
Establishment:
2011
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Shanghai AIYIA Group was established in 2008. We are located in Shanghai, an international metropolis. We are a company that produces and sells various steel products. The company's main products...

1
    YRS
General Supplier
Supplier Homepage Metallurgy, Chemicals, Rubber & Plastics Energy Electricity Generation AIYIA 3MW horizontal axis wind turbine/wind driven generator/HAWT

AIYIA 3MW horizontal axis wind turbine/wind driven generator/HAWT

Get Latest Price
Min. Order / Reference FOB Price
1 Sets US $12000000.00/ Sets
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: AIYIA GROUP
Model Number: AIYIA
Type: Generator
Electricity Generator Type: Wind Power

Name
Unit
parameter values
power
KW
3000-3500
Impeller diameter
M
90
Cut in wind speed
M/S
3.5
Cut out wind speed
M/S
25
Rated wind speed
M/S
13
Hub height
M
60-80
Survival wind speed
M/S
70
Living environment temperature

-25 to +50
Operating environment temperature

-15 to +45
ways of cooperation
1: download the tendering plan, confirm the content of the plan, and pay attention to local policies and regulations. (I will copy the tender document after downloading the tender, and invite it to the wind turbine company and the infrastructure company in the name of our company as the issuing director).
2: select the appropriate megawatt grade fan (according to the climate and geomorphic features of the installation), and then the estimated total power / megawatt grade = the number of land base MW grade (1.5, 2, 2.5, 3, 3.5, 4), but the domestic technology is most stable at less than 3, and 1.5 has been eliminated. Sea based megawatt rating: currently only 3 megawatt sea based fan is available in China.
3: quote: total budget = fan unit price * quantity + base construction total cost.
4: the first building of a substation (can be built by the customer, but with the requirements of wind power requirements), and then the windmill company is responsible for installation and access to the substation, trial operation 48 hours after the effective warranty.
5: establish warranty policy and local operator training, and establish confidential programs and agreements.
major equipment
Wind turbine, wind turbine, tower, tower, yaw, computer monitoring system, microcomputer monitoring system, DC system, security monitoring system, inverter controller, electronic controller, rectifier, sensor, hydraulic system, cooling system, battery, sensor, transducer, single chip microcomputer, power amplifier Control equipment, booster station, main transformer, station transformer, box transformer, lightning arrester, high voltage electrical equipment, low voltage electrical equipment, high and low voltage distribution cabinet, battery cabinet, vacuum circuit breaker, complete switchgear, high frequency cable, high and low voltage cable, control cable, cable pipe, neutral grounding protection device Rammer, excavator, crane and so on.

Send your message to this supplier

*From:
To:
Shanghai Aiyia Industrial Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now