Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Steel Pipe, High Strength Heat Treatment Anchor Bolt, High Strength Heat Treatment Stirrup, High Strength Heat Treatment Anchor, High Strength Heat Treatment Steel Rod
Establishment:
2005
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Dragon Anyang Steel Manufacturing Co., Ltd., located in Yin Industrial Park, with a total area of 300 acres. South of State Road 107, west of North Water Transfer Project, convenient transportation an...

1
    YRS
General Supplier

Wind Turbine Foundation Anchor Bolt Cage/Caps/ Covers

Get Latest Price
Min. Order / Reference FOB Price
1 Ton US $1400.00/ Ton
Local Area: Anyang, Henan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: LT
Model Number: M48 M42
Type: Plant
Electricity Generator Type: Wind Power
about Us
Wind Turbine Foundation Anchor Bolt Caps/ Covers

Anchor Cage For Wind Turbine
OEM Heat Treated Anhcor BoltOur Story
Since beginning operation in 2005, Anyang Longteng Heat Treatment Material co.,ltd. has been dedicated to providing more than just material supply, We has helped customers reduce costs and improve the bottom line. This approach to partnering with customers has made our Products a leader among steel pipe suppliers and one of the fastest growing companies in China.



Advantages
Registered capital of 147.89 million RMB
200,000 square meters factory
more than 500 employees
Annual production of 150,000 tons of high-strength high-performance heat treatment of steel
100,000 tons of seamless steel pipe tubes.


Mission and Vision
We aim to became one of china’s most potential company. And deliver our products with the best service and supply chain in the world. To reach our goals, we are building the world’s premiere team of piping product experts and providing the opportunity and environment for our team to succeed both personally and professionally.



Main product scope

Seamless steel pipe, high-intensity heat bolts, high strength heat-treated steel rod, high strength heat stirrups, high strength heat-treated steel bolts, hot-rolled seamless steel pipe, prestressed concrete steel and other heat treatment, the product can be widely used in bridges, High-speed railways, highways, tunnels, energy, mining, steel construction, reinforced concrete construction and other fields.Product DescriptionGeneral Introduction
With increased demand for greater output from wind energy projects, the industry is increasingly looking to maximize output from each wind turbine. Over the years, wind power has become competitive with traditional forms of non-renewable energy because advancements in generator technology allow larger and heavier generators to produce a higher-megawatt output than ever before. These newer, advanced turbines are also carried on towers with higher hub heights to capture higher wind speeds. With this comes the requirement for tower anchor bolts to carry higher tensile load capacities.
Anchor bolt GradeNut GradeWasherSizeImpact release Length (mm)8.8835-45 HRC
M20-M646510000 MAX
9.895510.9105012.91240GradeRm/MpaRp0.2/MpaA%Z%-40℃Akv2/JHardness10.9≥1040≥940≥9≥48≥50HRC32-398.8≥830≥660≥12≥52≥70HRC23-34Design and installation
To safely carry larger turbines at higher hub heights, careful consideration must be given to the foundation design and system components. A proper geotechnical evaluation of the soils must occur after all of the structural loads carrying the tower and nacelle components are evaluated. With this information, the foundation designer is able to determine the width and depth of the concrete foundation. A vital component to the foundation system is the tower anchor bolt. These anchor bolts are responsible for keeping the tower and nacelle in equilibrium. The anchor bolts are installed during the foundation forming process in a large ring pattern with a matching inner and outer circle of anchor bolts symmetrically around the foundation.Typically, between 140 and 200 anchor bolts are in each foundation design. A thick steel embedment ring containing holes for the tower anchor bolts is placed near the bottom of the foundation pour, and a template ring – ostensibly, a thinner steel ring with matching holes – is placed at the top of the foundation pour. Each anchor bolt is fitted with PVC sleeves running between the steel rings so they are flush against each ring surface in order to keep the anchor bolts de-bonded during the foundation pouring operation.A heavy pattern hex nut and washer are underneath the embedment ring and similarly placed on the tower base plate. (Prior to placing the tower base plate, the temporary template ring is removed after the concrete pour.) It should also be noted the tower base section is shimmed into position above the top of the pedestal foundation pour, and the voided area between is filled with a high-strength epoxy grout to complete the grout pad.once the grout pad is cured, all of the tower anchor bolts are pre-tensioned to a load specified by the foundation designer and locked off by torquing the top hex nuts to remove the stretch created. The pre-tensioning process is typically achieved by using small-diameter, compact, high-psi capacity calibrated tensioners. This elastic stretch created by tensioning under load is permanently transferred to the anchor bolt by torquing the nut prior to removing pressure from the tensioning jack.After pre-tensioning the tower anchor bolts in a predetermined selected pattern across the foundation, the ring pattern of the anchor bolts is placed into compression. Therefore, the equilibrium is maintained as varying load cycles are continuously placed on the foundation. Designers specify an anchor bolt lock-off pre-tensioning load to be at a level where the maximum external design load that is placed on the foundation is never reached.Pre-tensioning prevents the anchor bolts from stretching and relaxing, which can lead to long-term fatigue, and also mitigates spalling or cracking of the concrete from tensile stresses.The normal practice is for the foundation designer to specify a lock-off load that takes into consideration in-service design loads and, in addition, losses such as natural relaxation loss in the steel (generally averages 2% max) and slight creep losses in the foundation itself under load. Creep refers to the slight movement over time to the concrete – and, to a lesser extent, the steel tower base as a result of being under the pre-tension load. Movement resulting from the so-called creep results in a loss of direct pre-tension load.ApplicationAnchor Bolt/ Anchor Cage For Wind Turbine Foundation
Our factory is a specialized manufacturer producing high strength bolts for Wind power generator, high strength bolts for nuclear power generator, high strength bolts for steel structure, cheese head studs for arc stud welding, High Strength Ring Bolts and special high strength fasteners. Also used for equipment for nuclear power plant, the boiler steel construction of power station, mechanical and electrical equipment, airport hangar, large span bridge, skyscraper, high speed train and the railway track switch.
Packing & DeliveryMaterialmaterialCSiMnPSCrNiMoCu35CrMoA0.34-0.390.17-0.370.40-0.700.015max0.010max0.80-1.100.30max0.15-0.250.25max42CrMoA0.39-0.450.17-0.370.50-0.800.015max0.010max0.90-1.200.20max0.20-0.250.25maxProduction LineQuality ControlCertifications
Achieving the ISO 9001:2008 Certification is just one example of our Products’ dedication to quality and continuous improvement. Each employee is responsible for understanding company expectations and adhering to the procedures of our Quality Management System.
Our Products ensures customers receive the material ordered with accurate supporting paperwork. Customers can count on proper documentation, on-time performance and effective follow-up.
Guarantee
We will continually improves and expands the quantity and quality of our product which exactly meet customers need. We do whatever it takes to make our clients happy.
We will develop long-term commercial and technical partnerships with customers. And we are committed to continual quality improvement of all internal processes. The success of our quality program is affirmed by our strong customer retention rate.

Send your message to this supplier

*From:
To:
Anyang Longteng Heat Treatment Materials Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now

Contact Supplier

Mr. Leo Sun
Sales Department
Sales Manager