Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Metal Display Stand, Acrylic Display Stand, Wood Display Stand
Establishment:
2011
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

1
    YRS
General Supplier

2020 rotating metal rack display stand for sunglasses

Get Latest Price
Min. Order / Reference FOB Price
10 Sets US $50.00/ Sets
Local Area: Shenzhen, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Centroyal
Place of Origin: Guangdong, China
Brand Name: Centroyal
Model Number: CR-MF-488-1

Product Name
metal sunglasses display rack
Size
Customized 
Material
metal
Surface treatment
Powder coating or baked paint finishing Type Floor Standing
Color 
Black or Customized

Q: What can we do for you?
A: .Concept & structural design Prototyping.
Logistic operationCost estimation .Production


Q: What kinds of material can we handle?
A: Multiple materials are available to ensure we can produce what you desian effectively.
We are professionally manufacturing all kinds of customized point of purchase displays.
metal Stainless steel, Steel, Aluminum, Brass etc
Plastic--crylic, PVC, PC, PE, PP, ABS etc.
Timber-Solid wood, MDF, Plywood, Bamboo etc.


Q: What kinds of processing can we handle?
A:Steel with powder coating or chrome plating
Acrylic with silkscreen printing direct, printing
MDF with painting or veneer
PVC board with digital printing, direct printing, silkscreen printingLighting (LED, fluorescent tubing)Stainless steel with brushing or polishing
Aluminum with extrusion, oxidation
Solid wood with painting


Q:If I want to get a rough price, what should I provide?
A: If vou can provide us a raw design idea, general sizes and what kinds f produce need to displav. Our engineer can base on it to make the rawing and quote.
Q:What is the sampling lead time and sampling fee?
A: Normally sampling leadtime is 10-15 days, sampling fee is twice of the unit price.
Q:What is the payment term?
A:T/T pavment term, normally is 30% deposit after placing PO, and 70% at the
copy of BOL After we receive the balance of payment, we would send you the telex release BOL.


Q:What is the mass production leadtime?
A: For the new product, first shipment would need 45 days since we need to make tooling andxtures. For the repeat order,
leadtimewould be 35 days.

Send your message to this supplier

*From:
To:
Shenzhen Centroyal Metal & Plastic Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now