Product Description
Quality Assurance Raw Material Sheet metal Automatic Ticket Vending Machine Enclosure
Detailed Images
Product Name
Good-material parking lot automatic ticket machine shell enclosure
Sheet metal material
Stainless steel
Sheet thickness
2.0mm
Molded parts
Cabinet
Surface treatment
Wire drawing
Proofing cycle
8-15 day
Processing cycle
>16 day
Application field
Communication, industry, electrical, construction
Related Products
Our Company
Shenyang Smile Technology Co., Ltd. was established in 2005. Always adhere to the "scientific and technological innovation, cooperation and win-win, integrity and service guarantee" as the service concept, to build enterprises with high-tech and brand, we have a professional team and mature technology. Our main products are Rittal chassis cabinets and accessories series; stainless steel chassis cabinet series; outdoor chassis cabinet series, etc. We are a custom sheet metal processing and manufacturing company.
Certifications
Production Process
At present, the company has 20 professional technical personnel responsible for design and development and more than 200 experienced and capable staff. The company has an annual production capacity of 100 million yuan. The company has a fully-automatic spray production line, professional water curtain spray room. The company is committed to the development, design, production and sales of professional precision sheet metal and machine cabinets, which is an excellent manufacturer of various kinds of industrial electrical, electronic control boxes and factory servers, network box series and consoles.
Factory Equipment
FAQ
1,How is quality monitored?Strive for excellence, survive by quality, continue to perfect, develop by reputationDesign and production pass rate of 95%, factory product pass rate of 99%, customer complaint rate is less than 1%.2,For the customer to confirm the product aspect?The qualified prototype product will be submitted to the customer for final /confirm/iation. The company will summarize and analyze the trial results to achieve the best results.3,How is the product designed and verified?Design input, design output, design verification and validation.Drawings and technical specifications are confirmed by the customer.4,How long is the processing cycle of the product?about 16 days.