Business Type:
Trading Company
Establishment:
1999
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Shijiazhuang Dayang Environment Engineering Co., Ltd. is a company specializing in clean-room products and clean engineering. It is a leader in the production, research, development, construction and...

1
    YRS
General Supplier

Magnesium Oxide Board Magnesium Sulfate Board Mgo Board

Get Latest Price
Min. Order / Reference FOB Price
200 Unit US $0.90/ Unit
Local Area: Shijiazhuang, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: DY

Electronic interlock pass box air shower pass box for clean room's peculiarity:
1.Using HEPA filter system
2.Fan: low vibration, low noise, imported or domestically fans
3.Subsidiary parts: Intercom, Ultraviolet sterilization lamp
4.Air shower pass box have dual function of a gate and lock , passed Items must be air showed after can enter cleanroom, so can effectively To prevent passed item be carried dust or bacteria into the clean room.
Laboratory clean transfer window/cheap transfer box's main characters:
1.The outer wall is high-quality SUS304 stainless steel 1.2 mm thick material.
2.The short distance transmission Windows work surface is made of stainless steel plate, flat is bright and clean wear-resisting.
3.Long-distance transmission Windows countertops use unpowered rollers, transfer items easily.
4.On both sides of the gate has a mechanical interlock or electrical interlock device, make sure not in an open position at the same time on both sides of the door.
5.The outlet of the wind speed up to more than 20 s.
6.Adopts hepa filter with separators, the filtration efficiency is: 99.99%, to ensure that the level of purification.
7.Using EVA sealing material, sealing performance is high.
8.imported electronic components, reliable in performance.Note: Specifications listed in the table are only for customer’s reference.
It may be designed and manufactured customized.
What is yourpayment terms?
Payment terms vary among different countries. Generally,30% T/T in advance,70% balance before shipment.
Can I use my own LOGO design on goods?
Yes, customized logo and design on mass products are available.(It can’t constitute infringement)
Can I customized the products?
Yes, customization is available.
What is the lead time after placing the order?
Normally, it takes about 1-2 weeks after your order. However, it would depend on our production line schedule and the complexity of the item.
Engineering is about 1-3 Months after receiving your /confirm/iation.
What is the delivery term for making business?
Normally FOB is popular. CIF and C&F are avalable if you prefer.
Do you test all your goods before delivery?
Yes, we have 100% test before delivery.

Send your message to this supplier

*From:
To:
Shijiazhuang Dayang Environment Engineering Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now