Business Type:
Manufacturer/Factory,Trading Company
Business Range:
press brake die, press brake tooling, shear blade, components, mould
Establishment:
2006
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
South America, Africa, Southeast Asia
OEM/ODM Service
Sample Available

Maanshan Golin Press Brake Tooling Co., Ltd. is a professional company for manufacturing press brake tools and guillotine shear blades. All of products have good quality and process with advanced equi...

1
    YRS
General Supplier
Supplier Homepage Machinery, Industrial Parts & Tools Fabrication Services Moulds Factory Instock Cheap Price Single V Mold V8 Die Set Tooling

Factory Instock Cheap Price Single V Mold V8 Die Set Tooling

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $450.00/ Piece
Local Area: Anhui, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Golin, Golin
Place of Origin: Anhui, China
Brand Name: Golin, Golin
Model Number: No
Factory Instock Cheap Price Single V Mold V8 Die Set ToolingPRODUCT DETAILS Of Single V Mold V8 Die Set ToolingSIZE Of brush floor scrubber Of Single V Mold V8 Die Set Tooling
The true standard length of the national diamond press brake die is:
Two kinds of L835mm and S415mm. According to the length of the press brake machine worktable, it is used in combination.
The standard segmentation size is:
Lower model:10,15,20,40,50,100,200,400=835mm (set)COMBINED REFERENCE TABLE Of Single V Mold V8 Die Set Toolingabout US Of Single V Mold V8 Die Set ToolingOUR STRENGTH Of Single V Mold V8 Die Set ToolingOUR CERTIFICATE Of Single V Mold V8 Die Set ToolingSHIPPING Of Single V Mold V8 Die Set Tooling
Shipping Method
Quantity
Means
Of Transport
Shipping Time
Origin And
Destination
Express
Suit for
small order and sample order
DHL
Fedex
EMS
UPS
3-10 days
Door to door
Air Transportation
Suit for middle order
such as:200-1000 pcs
By Plane
5-15 days
Airport to airport
Sea Trasnsprtation
Suit for big order such
as: over 1000 pcs
By Ship
15-30 days
Seaport to seaportFAQ Of Single V Mold V8 Die Set Tooling
1. Q: Are you a factory or trading company? How is you factory extrusion experience?
A: We are a factory. 15 years Manufacturing experience.Leading supplier in Maanshan city.
2. Q:Can you put my brand logo on these products?
A:Yes we can.
3. Q:What is the Minimum Order Quantity (MOQ) for your OEM service?
A:MOQ is 1pcs.
4. Q:When can you ship the products after we make payment?
A:Production time is normally 15-25 days.

Send your message to this supplier

*From:
To:
Maanshan Golin Press Brake Tooling Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now