Business Type:
Trading Company
Business Range:
ductile iron pipe, ductile iron pipe fitting, ductile iron manhole cover, iron casting, steel casting
Establishment:
2016
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
South America, Southeast Asia, Africa
OEM/ODM Service
Sample Available

We have rich experience of design and research in the industrials of iron / steel casting and forging, metallurgy equipment, machines and spare parts as well as other OEM products. Our professional ma...

1
    YRS
General Supplier
Supplier Homepage Home, Lights & Construction Construction & Real Estate Formwork Competitive Price of Construction Formwork for Saving Costs

Competitive Price of Construction Formwork for Saving Costs

Get Latest Price
Min. Order / Reference FOB Price
1 SquareMete US $10025.00/ SquareMete
Local Area: Taiyuan, Shanxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Darleysense
Model Number: D18200
Application: Construction
Material: Plastic
Product Description
Plastic hollow construction formwork is a new environmental-friendly product made by imported polypropylene resin as raw material. It has advantages of better superior performance, more environmental-friendly, waterproof, corrosion resistance and multiple reusing compared with traditional formwork products. Plastic hollow construction formwork have been using in the fields of Architectural Engineering, Water Resources and Hydropower Engineering, Bridge, Riverway Engineering and Tunnel engineering etc.
Product Performance ParameterTensile Strength≥18.0MpaCharpy Impact Strength≥21.0KJ/㎡Bending Strength≥31.0MpaFlexural Modulus≥1100 MpaShrinkage Rate (longitudinal) 80℃*168h≤0.8%Shrinkage Rate (horizontal) 80℃*168h≤0.6%Screw Holding Capability≥1200NProduct ShowProduct Characterist
1. PP alloy material: plastic formwork has perfect combination of rigidity and plasticity-featured by high durability, high strength, big impact resistance strength, light weight and long service life, it could be sawing, planing, and screwing.


2. Convenient Construction: plastic formwork has completed specification and light weight that is easily for installing or dismantlingi the forwork structure with lowlabor intensity and high construction efficiency.


3. This new plastic formwork product has advantages of high strength, strong toughness, high impact resistance, strongelasticity and non-deflection so it could be reusing up to 70 - 80 times.


4. High water resistance: the material'sexpansion rate is less than 0.06% afterabsorbing water, and the plastic formwork could keep stable dimensions withoutlayering or decay whenimmersing long time in water. Its usingenvironmental temperature is from -20℃~60℃ and it even could be used in coastal areas, underground construction, mine, dyke and drainage project more suitable than steel formwork.


5. Quick stripping: the surface of plastic formwork is smooth, flat and clean so its strippability against concrete is good and easily for stripping. The plastic formwork could help construction progress to be speed up and implement as-cast-finish concrete.


6. High plasticity: the plastic formwork could be made as different shapes and specifications by various of moulds according to construction design and client's requirement. And formwork surface could be made as decorative pattern tocombine formwork construction and decorative construction.


7. Easy cleaning & maintenance: it is no need to paintreleasing agent in using the plastic formwork process. After using it is easy to clean the formwork for preparation of next time using so saving cost of cleaning and maintenance compared with traditional formwork products such as steel formwork, wooden formwork and aluminium formwork.


8.High efficiency and environmental protection: the plastic formwork could be recycling and reproducing toreduce pollution and protect enviroment.




Plastic Formwork Compared with Other Traditional Formwork ProductsConstruction Effect
Column after removing plastic formwork
Stairs after removing plastic formwork
Wall body after removing plastic formwork
Wall effect after removing plastic formwork
Wall effect after removing plastic formworkPacking & DeliveryOur FactoryOur ClientsFAQ
1 Are you a Trading Company or a Manufacturer?A: We are 100% a real manufacturer and identified by TUV company.2 What is your manufacture time?A: Usually within 30 days depends on deposit received time and order quantity.3 What's your price?A:The price is basing on exact order quantity and situation of raw material market, so please provide order quantity, anticipated ordering time and destination port to us.4 What is your MOQ order?A:Usually 100 square meters is our MOQ.5 Do you accept customized requirement and size?A: Yes, sure. The size could be made according to required sizes and customized logo is available on product surface or package.6 Do you offer direction for using?A: Yes we can give clients guidance of how to use the plastic formwork, how to clean it and how to storage and reuse it. 7 What is your warranty? What do we do in case of problems?A:We provide 5 years warranty that our plastic formwork could be reused by 50 - 80 times within 5 years.8 Other questions?A:Please feel free to contact us, we will try our best to service you!

Send your message to this supplier

*From:
To:
Shanxi Darleysense Industrial Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now