Specification
Dimension(L*W*H)
2120*1900*2250MMPallet Dimension
600*600MM Number of Axis
3
Number of Pallet
1 or 2
Spray gun brand
Anest IWATA/Monali/Wagenr/robotic spray Gun
Number of Guns
1 or 2Product Description
Why use Spray Painting Machine?
Appliances
Comparison between automatic spraying machine and manual spraying
Company Profile
Certificate
Packing & Delivery
Our Service.
Installation and trainingCustomer can arrange staff come to our company receive training if possible. once the complete coating line start building, we
will assign related technician come to onsite to proceed with until trial production completed. Also, we are pleasure to share
information of maintain and technologic if necessary.After-sales serviceThe main parts of coating system warranty 1 year.Other parts damaged by people or consumable spare parts out of warranty. We are
offering full life maintain service and 24 hours online service. The overseas project install charge or occurring related fee
should be bear by customer.FAQ
Q1 How to purchase?A1 Please describe the workpiece details to us, like dimension and thepainting required etc, we will make out a appropriate painting system and equipment installation proposal to comply with your required.Q2 Supporting serviceA2 We will offer the whole plant design proposal freely before place order. We are welcome customer visiting the coating line onsite anytime. We will prepare the detailed technology proposal after get approval between customer and manufacturer. Further we will share information about paint and dedust etc to you.Q3 QuotationA3 The price showing on website is not the real because vary item with different price. The final quotation based on two side (customer and manufacturer) confirmed the technology project afterwards.Q4 Payment termA4 The stock & small and middle-sized machine & large equipment & whole coating system deposit by 50%, the qualified machine before shipping should pay 50%.Q5 Installation and trainingA5 Customer can arrange staff come to our company receive training if possible. once the complete coating line start building, we will assign related technician come to onsite to proceed with until trial production complet