Product Description
PRODUCT NAME
New design church metal muslim prayer chair with plastic film
MODEL
YJ-M011
DESIGN
Muslim style
USE
Church/meeting hall
frame MATERIAL
Iron
SIZE
690*520*900mm
frame FINISH
Spray painting
SPONGE
High density sponge
TUBE SIZE
25*25*1.2mm
TUBE THINCKNESS
1.2mm
PLYWOOD
10mm
STACK
8pcs/stack,Stackable design to save space and freight for you
NET WEIGH
11 KG
PAYMENT
T/T
PACKAGE
Plastic bags packing first,then packing with a big package to avoid the hit.also can be packed
LOAD
300pcs/20"GP 600pcs/40"GP 700pcs/40"HQ
DELIVERY
18days/20ftDetails Images
1. frame with 2 layers oil paint ,which is anti-rust and anti-scracth
2. The chair seat under making by the high density foam.
3. Seat cushion: high density foam+ 9mm solid core plywood.
1. Side pocket design, enough space for books and small objects.
2.All the tube frame are smooth, wrinkle-free and non-deformed. And tube pipes have been meet the hardness standard.
3. The welding bead is smooth and meticulous, the joint is flat, firm and beautiful.
Related products
Production Flow
Showroom
Our company
Our products are applicable for all of the hotel banquet halls. Chinese and Western restaurants, modem conference halls, event halls, auditorium halls, recreational places and church halls, etc.
In recent years, our factory has introduced a series of advanced equipment including cutting machine, bending machine, drilling machine, sawing machine, welding machine, etc. This is the basic assurance for our quality control system.
FAQ
Q: Are you trading company or manufacturer ?A: We are factory.Q: How long is your delivery time?A: Generally it is 5-10 days if the goods are in stock. or it is 15-25 days if the goods are not in stock, it is according to quantity.Q: Do you provide samples ? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay the cost of freight. If the sample is ordered before final order, we will charge the sample fee first, then we will return it back to customer once final order /confirm/ied. Q: What is your terms of payment ?A: Mostly by TT, 30% down payment before production, 70% balance need to be paid before loading.