Product Introduction
US market light depravation greenhouse commercial used for medical planting
1. Offers growers greater flexibility when staging their crop cycles.
2. Protect crops from light contamination from neighbors, street lights, etc.
3. Reduce the amount of supplemental light reflecting out of the greenhouse at night.
4.Curtains provide simplicity, ease of installation, operation and control.
5. Offer daylight control and additional energy savings.
Main Structure
Hot galvanized steel frame, durable for 15-20 years.
It is rust-proof, durable, easy to install , and has strong toughness, good adhesion.
Covering material
100/120/150/200 micron PO film
Anti-dripping, anti-fog, anti-aging, high permeability, good light transmission, good heat sealability, water proof, moisture proof
120 micron black-white film
Blackout system
99% shading rate balckout curtain
Screen are movable. You can open or close it according to your local weather condition.
Optional system
You can choose the cooling system, irrigation system, circulation system, heating system, seeding bed, according to your requirement.
Product Parameters
Name
Arch
φ50x2.0mm arch pipe, 1m spacing
Hot galvanized steel square tube,
with zinc coated 275g/m²
service life: 15-20 years
Purline
5 rows φ25x2.0mm
Beam
50x50X2.0mm pipe
Derrick and Brace
φ32x1.5mm pipe
Door
2x2.0m sliding door
Optional system
ventilation, blackout system, cooling system, irrigation system, heating system, etc
The greenhouse size can be customized, the pipe can change according to your local climate information.
Packing & Delivery
Our Company
1. How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 15-60days.2. Can you supply sample?
Small parts can be supplied, but you should pay the express cost.
3. Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract.4. How to install greenhouse ?
Firstly we prepare the material and send the material to your city.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers.
If you think it is hard to build the greenhouse, we also can send engineers and workers to install for you.5. When installing, what cost should we pay?
Our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication.
Welcome to send the inquiry and requirement to us
Related Products
Mushroom greenhouse
Seeds tray
Roll up motor