Into Our Team
Automatic staple pin making machine
Detailed Images
To produce the staple/staple pin :
At first,you need to buy the raw material:galvanized wire(low cabon /middle carbon steel after cold-drawing,coated with zinc)
making Process:
Wire flattening machine---------wire gluing combiner---------forming machine
1.Main Process:
The galvanized wire will be flattened into flat shape line, flattening machine is the first step in the process of production equipment
Production capacity:
small wire (0.55-0.68mm):600-800kg/ 8 hours
Big wire(1.0-1.4mm):1T-1.2T/ 8 hours
Motor power
Speed
Wire flattening range
Weight
2.2KW
0-350m/min
0.4--2mm
900KG
>>>Click here to learn more about this product
2.Wire gluing combiner:
Process: use wire jointing machine ,wire will be combined and paste the flat shape line into a whole and make a wire band .it make flattening galvanized wire through coating ,drying and straightening to make wire band .
Production capacity:
small wire (0.55-0.68mm):2 tons/ 8 hours
Big wire(1.0-1.4mm):4 tons/ 8hours
Motor power
Speed
Weight
7.5KW
100--140pcs/min
2000KG
3.Staple forming machine Process:
use the forming machine, it can produce the finished product.
The mold including clamping pieces, knife , cushion black, punching sheet.
The nail is cut off, and then punching sheet hits the cap of nails.
Production capacity:
small wire (0.55-0.68mm)--600-800kg/ 8 hours
Big wire(1.0-1.4mm)--1T-1.2T/ 8 hours
Motor power
Speed
Combining width
Weight
9KW
2-18m/min
50-150mm
1500KG
>>>Click here to learn more about this product
Final product:
Packing & Delivery
1. Machines are wrapped in plastic film first before packing, which is to avoid moisture on the sea.
2.The machines are putted in strong iron sheet case/wooden case,which is free of fumigation, lined with metal wire if necessary.
Quality Guarantee Terms:
1.Quality guarantee term is for one year. Malfunctions which are caused by machine-self and quality will be responsible for our manufacturer.
2. Other malfunctions which are caused by operation mistakes, man-made problems, etc will be responsible for clients-self.
Related Products
Cold Heading Thread Rolling Machine
nail making machine brads making machine
Certifications
FAQ
Q: Are you trading company or manufacturer ?A: We are factory.Q: How long is your delivery time?A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.Q: Do you provide samples ? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay the cost of freight.Q: What is your terms of payment ?A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as free!!!