Business Type:
Manufacturer/Factory,Trading Company
Business Range:
U link, shackles, ring, clevis, U-bolt
Establishment:
1999
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Hangzhou Yunguang Power Line Equipment Factory has more than 40 years history. As a mature power line equipment factory, we have complete ability of chemical analysis, mechanical testing and Kim Sang-...

1
    YRS
General Supplier
Supplier Homepage Electrical Equipment, Components & Telecoms Electrical Equipment & Supplies Power Accessories Power Pole Mount Hardware Electric Line Fitting Utility Pole Protection Hardware

Power Pole Mount Hardware Electric Line Fitting Utility Pole Protection Hardware

Get Latest Price
Min. Order / Reference FOB Price
1000 Piece US $0.10/ Piece
Local Area: Huzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: XIZI
Model Number: customised
Material: steel or specified material
Finish: As specification
Product Description
Power Transmission Line Pole Mount Hot-dip Galvanized Fitting Bent Gasket Electric Line Fitting Utility Pole Protection Hardware Wecordiallylookforwardtoservingyouwithourbestgoodsandservice!
Hangzhou Yunguang Power Line Equipment Factory
ODM&OEMSERVICES
Service
Drawingsorsamplesprocessing/OEM/ODMserviceprovided
ProduceProcess
Drawings→mouldmaking→pre-forging→roughmachining
orfinishmachining→surfacetreatment→productchecking
→packing→delivery
ForgingMaterial
CarbonSteel,Alloysteel,Stainlesssteel
Standard
ISO
ProduceEquipment
FrictionScrewPressSeries,CNCLathe,MachiningCenter
(VerticalSpindles),CNCMillingMachine,BenchDrilling
Machine,HeatTreatmentEquipmentsandsoon.
Surfacetreatment
Heattreatment,Polishing,shotblasting,
Painting,Electro-plating,ChemicalPlating,
Inspection
Equipments
metallurgicalanalysis,Tensilestrengthtester,Hardness
tester,Altimeter,ScaleMicrometer,pressuretester,etc.
Delivery
Samplesaresentbyexpress
Largequantityproductsdeliveredtocustomerbysea
oraccordingtoyourrequest
Wedoforgingmostlyaccordingtoyourdrawingsorsamples.
Pleasesendusyourdrawingsincludingmaterial,dimension,
weight,quantity.Afterreceivingyourdrawings,wewillsend
youthebestquotationwithin2days.
Thank you! Have a nice day!Packaging & ShippingOur Services
How's the delivery time ?Usually it will take about two weeks for the order of 100,000 sets for productionTell me the standard of package?For inner box and master carton are made as per international standards,and we can makespecial design for you if need. Also if necessary, will be packed in pallet to avoid any damage.Tell me if we received the bad products?Send to us the bad products photos,we will send to you the new and the good products freely.Welcome to visit our factory!!!

Send your message to this supplier

*From:
To:
Hangzhou Yunguang Power Line Equipment Factory
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now