Business Type:
Manufacturer/Factory,Trading Company,Distributor/Wholesaler
Business Range:
UPS BATTERY, BATTERY CABINET, UPS, SOLAR SYSTEM, LEAD ACID BATTERY
Establishment:
2014
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
South America, Africa, North America
OEM/ODM Service
Sample Available

We are the manufacturer of battery and battery cabinet. We have 15years experience for making.We are specializing in the production of high quality products, we will support the customer the best serv...

1
    YRS
General Supplier

ups system wind system

Get Latest Price
Min. Order / Reference FOB Price
20 Piece US $40.00/ Piece
Local Area: Guangzhou, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: JL&OEM
Place of Origin: Guangdong, China
Brand Name: JL&OEM
Model Number: C6
C6 battery cabinet for solar system, ups system, wind system
Product Description
Specificationsbattery cabinet (C6)
solar battery box C6
size:585*450*610mm (L*W*H)
weight:18kg
load: 12pieces 38AH
Our battery cabinet is the perfect solution for creating additional space by replacing sealed lead acid battery, or when there is a need for a maintenance free, long lasting, self-sufficient battery back-up solution. The cabinet comes pre-wired from the factory, ready to install. Its modular design permits more than one battery cabinet to be mounted side by side on the same wall. Each module holds up to 20pcs 100Ah lead acid battery, Please note, the cabinet is without wheels without notice, but c1-c8 can be designed with wheels.
Packaging & Shipping
Our Services
Company Information
FAQ
Will need to install the battery in accordance with the requirements for correct polarity emissions in place, messenger wire way neatly adjust to ensure that all cells in a horizontal direction. Then connect copper platoon or connect the cable to the top of the two adjacent terminals is put one by one, insert the connecting bolts, wear the nut by hand (copper platoon connection).Inspect all bore copper platoon and terminal location whether appropriate, necessary exchange copper platoon or mend the hole on the copper platoon position, ensure that after the bolt fastening may not produce stress for the column. Then use the torque wrench bolts to the required torque value one by one.
In the connection operation, be sure to use with the insulation protection of tools; Don't put the instrument or any metal objects on the top of the battery, in case of short circuit damage battery. Pay attention to keep 1 cm between each battery monomer space for heat dissipation, also is each section battery around 1 cm gap, heat dissipation, otherwise it's easy to have a hot while charging out of control and lead to battery fire

Send your message to this supplier

*From:
To:
Guangzhou JL Electronic Equipment Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now