*A world from President:Are you looking to provide your customer with the best product at the best price? Welcome to Sunshine !For over 10 years, we've been working with our customers to design t...
Min. Order / Reference FOB Price | |
---|---|
10 Pieces | US $16.20/ Pieces |
Local Area: | Jiangmen, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | Sunshine |
---|---|
Material: | Plastic, Eco-friendly PVC |
Plastic Type: | PVC |
Type: | Zorb Ball |
Product Description
Great fun for all the big kids in the family and perfect for that party occasion. Get everyone off the couch and have a game of Bubble Football, it is hilarious, or do battle with each other like the Sumo wrestlers. They allow you to roll, fall, do headstands, battle and bounce without risk of injury.
Each bumper ball has 2 built in handles and adjustable safety shoulder straps which makes it secure to wear and safe and easy toplay in. The durable vinyl protective bubble has multiple air chambers to further ensure your safety. The concept of the body bubble bumper ball was voted the winner of the best new outdoor toy award.
Features:
• Inflatable protective bubble allows you to collide with one another in perfect safety
• Perfect for playing bubble football
• Inbuilt safety harness allows you to bounce without getting injured
• Great outdoor fun at parties and picnics etc
• Concept was winner of the best outdoor toy award
Tips:
• Do not over inflate
• Do not use on rocky or stony surfaces
• Ensure you do not wear clothing with sharp buckles or jewelry that could puncture the ball
• Ensure your head stays within the ball
• Adult supervision is required at all times
• Do not use as a life saving flotation device
Ask for sample Ask For Shipment Start Order
Recommend Products
Company Profile
Production Capacity | ||||||
1. Production Capacity | ||||||
Product Name | Production Line Capacity | Actual Units Produced ( Previous Years) | ||||
High Rise Air Mattress | 15000PCS/Month | Confidential | ||||
Lower Air Mattress | 25000PCS/Month | Confidential | ||||
TPU Sleeping Pad | 24000PCS/Month | Confidential | ||||
2. Production Machinery | ||||||
Machine Name | Quantity | |||||
150KW High Frequency Machine | 2 Sets | |||||
100KW High Frequency Machine | 3 Sets | |||||
50KW High Frequency Machine | 1 Sets | |||||
35KW High Frequency Machine | 7 Sets | |||||
25KW High Frequency Machine | 2 Sets | |||||
15KW High Frequency Machine | 4 Sets | |||||
3KW-8KW High Frequency Machine | 74 Sets | |||||
Printing Machine | 1 Sets | |||||
Digital Printing Machine | 1 Sets | |||||
Pinching Machine | 2 Sets | |||||
3. Testing Machinery | ||||||
Machine Name | Brand & Model No. | Quantity | ||||
Automatic Inflation& Deflation Testing Machine | 1 Sets | |||||
Impact Testing Machine | 1 Sets | |||||
Vibration Testing Machine | 1 Sets | |||||
Tension Testing Machine | 2 Sets | |||||
Aging Chamber | 1 Sets | |||||
Average lead time from product order confirmation to production delivery( products existing the factory): | ||||||
Product Category | Lead Time | |||||
Air Mattress | 35 Days | Days | ||||
TPU Sleeping Pad | 35 Days | |||||
Average Sampling Time | ||||||
Product Category | Lead Time | |||||
Air Mattress | 12 Days | |||||
TPU Sleeping Pad | 12 Days | |||||
The Shortest Sampling Time | ||||||
Product Category | Lead Time | |||||
Air Mattress | 5 Days | |||||
TPU Sleeping Pad | 5 Days |
Ask for complete Factory Inspection Report
Competitive Advantages
1. Product Group Capacity | ||||
1.1 Product Sold (Within 12 Months) | ||||
Products Name | Quantity | Revenue(USD) | ||
Air Mattress | 60000 PCS | Confidential | ||
1.2 Supplier Cooperated With (Within 12 Month) | ||||
No. of cooperation suppliers(total) | 46 | |||
No.of suppliers (which cooperated over 2 times) | 30 | |||
No. of provinces which cooperation suppliers belong to | 45 (Guangdong Province) | |||
We would like to provide design solution service for integration project. |
2. Real Case For Lower MOQ & Lead Time | ||||
Product Name | MOQ(Within 12 Months) | Lead Time | ||
TPU Sleeping Pad | 1PC | 7 Days | ||
3. Real Case For Large Contract & Lead Time | ||||
Product Name | Order (Within 12 Months) | Lead Time | ||
Air Mattress | 1000 PCS | 35 Days | ||
4. Overseas After Sales Service Capacity | ||||
4.1 Average response time | 9.6 Hours | |||
Certifications
Ask For ISO9001:2015, ICTI, GSV Report
Quality Control
Quality Assurance
1. Our company get the ISO 9001:2015 Certification, Certified by Intertek, UKAS
2. All production line have adequate quality control. 5 QC inspectors work independently from the silk-screen printing, high frequency welding and air testing&packing production line.3. There is a clear procedure to conduct random product inspections after final packing.
4. Accept the requests of the customer's designated international third party verification company to conduct the finished product inspection.
PVC Extension Test
Pressure Test Of Air Nozzle
Pull Test of Air Nozzle
Torsion Test
Transit Test
Supplier Management
1. Our company has a supplier assessment procedure, and has established and implemented a standard procedure for purchasing contract review and approval.
2. Our purchasing documents are sufficient to ensure product safety control and our customers' demands.
3. We will keep our supplier assessment reports for more than 3 years.
After Sales Service
1. If the customer finds defective products within 3 months after receiving the goods, please provide relevant records of defective products.After confirming the situation, P&D will negotiate the loss according to the damage rate of defective products, and the compensation for dective products can reach 100%.
2. In principle, we do not provide after-sales service,because we have a mandatory requirement that all products are 100%
qualified before shipment.
FAQ
1. Q: Is the factory tidy and clean enough for production?
A: Yes, very good.
2. Q: Are the following ietms/documents provided at the appropriate location?
A: Work instruction.
3. Q: How are finished products inspected?
A: 100% of products with detailed inspection.
4. Q: Would the company like to provide design solution service for integration project?
A: Yes
5. Q: Would the company like to provide a total solution foe purchasing?
A: Yes.
6. Q: Do the QA/QC inspectors work independently from the production line?
A: Yes.
7. Q: How many QA/QC inspectors in total?
A: 6 QC inspectors.
8. Q: Is there a procedure to conduct random product inspections after final packaging?
A: Yes, with clear standard and writtern inspection records.
9. Q: Do R&D employees use any specific software for designing new products?
A: Yes, PS, AI, CorelDRAW X7, Solidwork