Product DescriptionFeatures
1. The body is made of carbon steel.
2. Resilient housing guides to prevent metal-to-metal contact.
3. Hot dip galvanization finish.
4. Quick and easy installation.
5. Heavy-duty vibration isolation.
6. Weather resistant finish.
7. Patent No. M532523.
Applications
Heavy engines
Pumps
Chillers
Boilers
Compressors
Generators
Fans
Installation Guide
Required tool:17mm (M10) and 19mm (M12) open wrenches and claw jack.Step 1
Place the wooden panel with the same height as the isolator at the installation before installing.Step 2
Remove the upper nuts from the fixed bolt. Loosen the lower nuts to descend the bolt for the installation.Step 3
Place the isolator on the correct installation location.Step 4
Adjust lower nuts to raise the bolt to connect with the equipment and slightly lock the fixed nuts.Step 5
Apply open wrench in the clockwise direction to adjust the nuts. Adjustment can be stopped once wooden panel is removed.Step 6
After the adjustment, lock the isolator with fixed bolt.Our CompanyAdvantages
1. JSC is the first Taiwanese vibration isolation brand to obtain global ISO9001 certification.
2. Stringent quality checking process and performance testing to accomplish the best product.
3. Hot dip galvanization finish, good rust resistance.
4. Various types of vibration isolator for different kinds of machineries and equipments.
5. Quick and easy installation.
6. All of the JSC's products are pattern protected.
ExhibitionRelated ProductsCertificationsPackaging & DeliveryFAQQ: Are you trading company or manufacturer?
A: We are manufacturer of high quality vibration isolator with more than 30 years experience in Taiwan.Q: Do you provide samples ? is it free or extra?
A: We provide samples, but not for free.
Q: How long is your delivery time?
A: If we have enough in stock, we can delivery immediately. If not enough, it will depends on QTY, but normally around 20 working days.Q: Can the products be manufactured by customer's requirement?
A: It depends on the MOQ.Contact Us