Business Type:
Manufacturer/Factory,Trading Company
Business Range:
flat face mask machine, folding face mask machine, bouffant cap machine, shoe cover machine, glove making machine
Establishment:
2009
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Domestic Market, Southeast Asia, Africa
OEM/ODM Service
Sample Available

Dongguan Licheng Machinery and Equipment Co., Ltd. is a new enterprise which integrates RD, manufacturing and sales, specializing in the production of non-woven deep processing equipment. Our company ...

1
    YRS
General Supplier
Supplier Homepage Machinery, Industrial Parts & Tools Machinery Apparel & Textile Machinery LC Trade Assurance Supplier Fenestrated Surgical Gowns Drape Making Machine

LC Trade Assurance Supplier Fenestrated Surgical Gowns Drape Making Machine

Get Latest Price
Min. Order / Reference FOB Price
10 Sets US $190000.00/ Sets
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: LC
Voltage: 3 phases 380V 50Hz or 1 phase 220V
Warranty: 1 Year
Applicable Industries: Home Use, Food Shop, Food & Beverage Shops

Product Description
LC Trade Assurance Supplier Fenestrated Surgical Gowns Drape Making Machine
This machine is for the production of non-woven disposabe surgical gown. It adopts ultrasonic fusion technology, feeding from raw materials, forming and welding, forming and cutting.To the output of finished surgical gown;Total quantity count;Full automation
Machine FeatureMachine size9830mm*2780mm*2020mmVoltage220V single phase or 380v three phasePower9KWOutput capacity10-18pcs/m
Installation note
1:Remove the package, Please kindly check if the surface and components of machine are damaged, check if the screw is loose, , check if the electrical connector are damaged and check if the accessories are complete.
2:The machine shall be placed on a flat hard ground, and the mask machine shall be at least 0.5m away from the heat source, and ensure there have 1m distance between 2 sets machines.
3:Check the voltage requirements which is on the back of the vibration box to ensure that the system well- earthing.
4:Connect the machine to the electric, Please turn off the power first.
Machinery acceptance
1:The supplier shall notify the buyer to provide qualified materials and arrange technicians to come at the workshop of supplier 3 days before the completion of installation and commissioning.Checking the machine according to technical agreement.Both parties will sign qualifincation report after qualified inspection ,and then seller will deliver the machine.
2:The materials should meet with the request this agreement, and the details shall be separately appointed by both parties in appendix.
3:Both parties shall designate engineering to participate in the acceptance and sign the acceptance report together as following:
3.1:According to configuration details;
3.2:The machine does not include the outside power supply and air source , The buyer shouldpull the power supply and air source to the electric box
Company Information
Certifications
Warranty
Warranty:All the symbols on the equipment should be in English and Chinese, Seller is responsible to provide general layout plan, installation direction, and manual bood to buyer on time.After machine are delivered to customer's factory, buyer is responsible for all preparation worke, e.g. electrictly supply, gas supply, labors and carnes if to uper floor. Etc.For machine receiving, remove the package, check the surface for the machine, include the electrical cable joints, the screws and so on. the photos of damage or default should be provided within 24hours. The machine should be placed on a flat hard ground, keep away at least 0.5m away from the heat source, and make sure it is in frount or back of the earloop machine at leat 1m distance, left and right at least 1m space for further easy to operate.According to the voltage requirements on the nameplate of the equipment, connect the external correct voltage (ensure that the equipment is well grounded). LC can support engineer to customer's side for machine installation and training, for the round-trip air ticket, and all the expenses generated in Customer's country, e.g. meals,accommodation and allowance of USD 150 per day for each engineer.During the warranty time, LC will provide spare parts without any charge in case of quality discrepancy caused by us. if the malfunctions are caused by incorrect operations LC will provide the spare parts at cost price.Machine will be in maintenance all life, LC will provide technical guide and spare parts with cost price out of warrant time.
FAQ
Contact us

Send your message to this supplier

*From:
To:
Dongguan Licheng Machanical Equipment Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now