Business Type:
Trading Company
Business Range:
commercial plywood, film faced plywood, melamine faced plywood, MDF, H 20 beam
Establishment:
2012
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Domestic Market, Mid East, South Asia
OEM/ODM Service
Sample Available

Dongstar material Co.,ltd is the largest and earliest professional manufacture of Building materials in China , with a history of more than 20 years , our main products include : PVC Embossed film ,P...

1
    YRS
General Supplier
Supplier Homepage Home, Lights & Construction Construction & Real Estate Formwork China manufacturer concrete climbing scaffolding formwork factory

China manufacturer concrete climbing scaffolding formwork factory

Get Latest Price
Min. Order / Reference FOB Price
1 Unit US $300.00/ Unit
Local Area: Linyi, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Betterway
Place of Origin: Shandong, China, Shandong, China (Mainland)
Brand Name: Betterway
Model Number: Formwork System H20 Beam

The Modular formwork, abs plastic panel, concrete slab formwork scaffolding system is rationally assembled combined formworks,scaffolding with platforms. Compared with traditional construction technologies, it impoved the work efficiency, saving the labour and cost of formworks than turnover formworks. Beasides, they are easy operated and safe constructioned.
>>>>ConTACT USThe lateral pressure of the concrete is entirely supported by the anchor system, wall-through tie-rods are not needed. The finished concrete surface is perfect;The formwork can move backward entirety, which will be convenient for work;Coupling is used for connecting the neighbouring forms to make sure the forms standing in a beeline;The connecting components have a high standardization and versatility;The formwork can prop to the finished concrete tightly to avoid offset or leakage;The formwork can be adjusted horizontally or vertically as request;DP-180 system can be adjusted forward and backward. The Max. angle is 30°.
2.The second pouring(the first lift)
FAQ
1.How can I get a sample to check your quality?
After price /confirm/iation, you can get require samples to check our quality.
2.How long can I expect to get the samples?
After you pay the sample charge and send us confirmed files ,the samples will be ready for delivery for 7-10 days
3.What about the leading time for mass production?
It depends on the order quantity and the season you place the order.Generally speaking,production leading time within 4-6 weeks
4.Terms of payment?
30%T/T deposit,70%balance before delivery;
30%T/T deposit,the balance L/C;
L/C at sight.

Send your message to this supplier

*From:
To:
Linyi Dongstar Import And Export Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now