Plastic Bucket Mould
Mould Feature
1. Short cycle time and high efficiency in production. It takes about 25 seconds to make one 20 liter bucket.
2. Each cavity and core have independent cooling system, shortening production cycle time.
3. Rational mould design to extend mold life .
4. Mirror hand polishing to create added-value.
4. Precision Machining to ensure high production efficiency & fine parting line effect.
5. Skilled Language in communication and experienced in international standard.
High polish and mirror polish mould surface to ensure the plastic shiny surface.
square locking system is good for final bucket precision and looking.
Rich experience in bucket mould to ensure mould to work fastly, steadily and efficiently.
bucket Specification
Name
Description
Mould base Steel
P20
Mold base
Standard
Cavity and core material
H13, S136, etc.
Cavity number
2 to 6 cavities
Hot runner
valve gate or pin point
Cycle time
8-9 seconds
Mould Parts
LKM or DME or HASCO
Plastic material
PP
Mould life
>3,000,000 shots
Delivery time
50-65 days
We can tailor various kinds of bucket mould for each customer as per their requirements.
Why choose us
1. Provides clients with detailed product introduction and overall quotation service.
2. Quotation will be finished in 2 working days and delivery time can be guaranteed.
3. 3D drawing for free according to your samples.
4. Full automatic, high efficiency and less maintenance cost.
5. OEM Service is avaliable, wholesales & Large order have discount.
6. Weekly report, mould trial video and samples for your checking.
7. After-sale online support and spare parts supply support.
company information
TZ Shiny Mould factory is a leading provider of innovative, value creating mould solutions in China. Being in the plastic packaging mould field for 7 years, we have been devoting ourselves to producing and developing preform mold, cap mold, bottle blow mold, bucket mold, thin wall container mold, etc. With continuous improvement and innovations, we have become an outstanding enterprise in same line.We can handle all the mould production line, from drawing concept, development, production, quality control, maintenance and after-sales service, etc.
Latest CAD/CAE/CAM systems are adopted to ensure the project efficiency, such as UG, Pro-E. Also, we have advanced processing equipments like mold CAM machining center, CNC lathe, high precision electrical sparkle machine, large-sized milling machine. We will surely try our best to reduce the costs of mold according to your special requirements, and your mold will be ready in the shortest time through our effective project management.
Making Process
Packing & Delivery
We spread anticorrosive oil on the surface of the mould and then cover with plastic film.
Finally, it is put in the wooden case.
Special package is available if it is needed.Every order would be delivered on time.
FAQ
Where is your factory?
We locate in Taizhou, Zhejiang, China mainland. FIFTY minutes from Luqiao Airport. TEN minutes from Taizhou Railway Station.How about your quality control?
We have professional team to control mould quality, since we realize that quality control is the first priority to run business.
What's your lead time?
For most mould, 45 working days ( not including Chinese official holidays ) after deposit received and mould drawings approved.What type of process do you use on mould surface?
1) Mirror polish
2)Texture
3) Plating treatment on the core and cavity.
How to approval samples?
1) You can come to have the mould test directly.
2) We could send samples & mould running video to you.What about after service?
Spare parts delivery is available, and you can contact us at any time.