Installation Steps
1. Welding the external threaded sleeve on the steel structure after taking off the internal threaded sleeve
2. Adjusting internal threaded sleeve to appropriate position, and then tighten up locking ring.
3. Putting bolt through the center hole of spider.
4. Adjusting installation position of spider, then compressing spider tightly with bolt.
5. Dismantling parts such as screw nut and so forth, making the front part of spider fixed on the glass.
6. Pre–adjusting hexagon nut, spring washer, offset washer to the required position for installation.
7. Eccentric washer to be placed on the spider and adjusted according to the requirement of installation, slot hole should be transverse when loading and should be vertical without loading, and the long hole faces down.
8. Putting the thread rod of routel through the hole of spider, and adjusting to appropriate position, then tightening bespoke nut.
9. Finally, sealing the surrounding between routel and glass with sealant to prevent from leaking water.
Product DescriptionProduct Description
Brand Name
Route
Model Number
Route-spider
Materials
304 Chemical Composition: C≤0.08 Cr:18.00-20.00 Ni: 8.00-11.00 Si≤1.00 S≤0.030 P≤0.045
316 Chemical Composition: C≤0.08 Cr:16.00-18.00 Ni:10.00-14.00 Si≤1.00 S≤0.030 P≤0.045 Mo:2.00-3.00
Surface
Satin, Mirror, Fluorocarbon Coating(many colors are available)
Arms
4arms, 3arms, 2arms(90°/180°), 1arm(long single/short single)
Type
100 series,120 series,150 series,160 series,200 series,210 series,220 series,250 series,300 series,2540 series,2542 series,3060 series,3535 series,W300 series…
Application
Curtain wall system. Widely used in the footpath, playground, gardens, station and other public places
MOQ
50 PCS, sample is acceptable
Packing
Bubble bag/PE bag & Standard export carton & Non fumigation pallet Or customized
Shipping
By sea, by air or express as you need
Delivery Time
Usually 10 days, mainly by your true quantity
Supply Ability
about 80 tons/month
Remark
OEM is acceptable
Payment Term
T/T, L/C