Business Type:
Manufacturer/Factory
Business Range:
LED lighting, led lamps, led down lights, led spot lights, led wall lights
Establishment:
2012
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Western Europe, Northern Europe, North America
OEM/ODM Service
Sample Available

If you are looking for an unique quality lighting product, you will be confident that you finally have the answer when you find this site. Since founded in 2004, Passun Light have been leading the tre...

1
    YRS
General Supplier
Supplier Homepage Home, Lights & Construction Lights & Lighting Indoor Lighting Chandeliers & Pendant Lights Restaurant Led Pendant Lighting Dining-table Led Pendant Lights Chandeliers Led Pendant Lamp

Restaurant Led Pendant Lighting Dining-table Led Pendant Lights Chandeliers Led Pendant Lamp

Get Latest Price
Min. Order / Reference FOB Price
30 Piece US $10.00/ Piece
Local Area: Zhongshan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: PASSUN
Model Number: LPL298-BK
Material: Aluminum
Type: Contemporary

Restaurant led pendant lighting shape modern chandeliers pendant lights interior cob 10w led pendant lamp for dining-table Porduct nameInterior led pendant light&modern led pendant light&office led pendantlightItem No.LPL298-BKBrand namePASSUNWatts10WIP RatingIP20Constant Currnet300mASizeD250xH1200(mm)Lumens output900lmMinimum lighting distance0.5mInput voltageAC85-265V/50-60HzLED SourceCREE COB LEDOperating Temperature-20-+50degreeLED Lamp Life>50,000 hoursRelevant Certificate5yearsBeam angle30degreeColor Temperature3000K,4000K,6000KHousing MaterialPure aluminumFinishingBlack paitingInstallationRecessed mountedInner box size30x30x30cm for office led pendant lightNet weight1.34KG formodern led pendant lightRelated Products
Product family ofmodern led pendantlightInstallation
MOQ:
1. For all models,If the items in stock ,MOQ is 1pcs,if no , MOQ is 30pcs and the produce time is 15-20 days.
when we received your order,wewill let you know the stock informationand the delivery time.
2. If change the LED color temperature,CREE XPE and COB LED,MOQ 5pcs,under the MOQ,add the extra costs 15USD of eachitem.the SMD LED,MOQ 30pcs,under the MOQ, add the extra costs 45USD.
3. If change the finish for painting in black or in white,the MOQ 30pcs.If it's the special finish,the MOQ 100pcs.
4.Theoxidizing finish change to in Glod,Black,Silver,and theelectroplating finish change to Painting,MOQ 30pcs.
5. If thePaintingfinish change to theelectroplating,MOQ 100pcs
6. If change the size,such as the lenght,width or other,if no problem,MOQ 100pcs.
7. Normally we will put 10-30 pcs for each item 3000K in the stock.
OEM:
1. The turn-milling items,MOQ 100pcs,no the mould charges.
2. Thepunching press and flow formingitems,MOQ 100pcs,according to the size and the mould charges about 85-1000USD.
3. The aluminum material mould,MOQ 200KG original material + Mould charges.
4. Thepressure casting andplastic mould,MOQ 300pcs+Mould charges,according to the size and the mould charges about 1670-5000USD.
Produce time:
1.We delivery goods from the stock about 2-3days afterwe receivedthe confirmed order and the payment.
2. If some items is no thestock, the produce time is 15-20 days.
3. If change the size,the produce time is 20-25days.
4. If the new mould,and confrim the first sample,the produce time is 25-30days.
5. If Thepressure casting andplastic moulds,the produce time is 35-45days.
Payment term:
1. We accept T/T 30% deposit when order is sealed and 70% balancebefore shippment only.
2. T/T100% in advance if total value under $3000 an order
Download our full catalogue from Dropbox share link:
https://www.dropbox.com/sh/b5vok158tbri8ao/AACcUjxx1v1LqxdcLGHKhBSHa?dl=0Application
Applicationof office led pendant light
Our showroom
about usCompany Information
CertificateCertifications
Download our full catalogue from Dropbox share link:
https://www.dropbox.com/sh/msfhe2oya39zwkq/AAAe6GBA2KCpK1tcB6yorVcVa?dl=0
Packing & shipping informationPackaging & Shipping Production TimeSample Order(<5pcs)1-2 daysSmall Trial Order (<10items/100pcs)7-10 daysFormal Order (<30 items/1000pcs)
10-15 daysBulk Qty Order (<100 items/3000pcs)
15-30 daysContainer Order (20 GP/40 GP/40 HQ)30-45 days

Send your message to this supplier

*From:
To:
Zhongshan Passun Lighting Factory
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now