Business Type:
Manufacturer/Factory,Trading Company,Agent,Distributor/Wholesaler,Government ministry/Bureau/Commiss
Business Range:
Tamping, Plasser Parts, Car, Jv
Establishment:
2012
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Remtechstroj Group is a company offering numerous complex services and products, servicing wide range of industrial enterprises in power engineering, ore mining, mineral processing, chemical, railway,...

1
    YRS
General Supplier

European VIP Port Varna For Investment

Get Latest Price
Min. Order / Reference FOB Price
1 Plant US $1.11/ Plant
Local Area: Bulgaria
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union

VIP Port Varna Project: Port and traffic tower of Varna and new urban landscape and the decision of the zone of the marine station and the port area "Varna, east"Description: The project includes a complete reconstruction of the areas of the existing harbor station and cargo port "Varna - East," which under the new Master Plan of the city are provided for the area with public access, serving passengers on passenger ships. The new park is a kind of continuation of the Sea Garden and the proposal for a new maritime station compositional participate in the landscape. link Building - sea is recreated by the impact of the marine station in the water that ends and overall appearance.Another project by the architect. MANEVA:Varna is a modern coastal city that is developing at a very fast pace. In recent years it has become an interesting tourist and business destination, as well as the administrative center of the Bulgarian Black Sea coast. To reach a new and modern look of the city, the new Master Plan of the Municipality of Varna includes a complete reconstruction of the territory of the passenger port. Increased flow is also reason why Bulgaria needs a modern building which will act as Port, but to be seen as a symbol of our beautiful sea capital.On the one hand, this is my main reason to choose this topic and on the other - the challenge to design a building that is the first of its kind in the country ni.Sled depth study of the urban situation and functional problems of this type of building, drafted a job design as a modern look and function like a harbor station and the adjacent parkova sreda.Sashtestvuvashtata Marine Station, built in 1968, is situated on an artificial pier whose length is not sufficient to service the larger cruise ships.Next to the passenger terminal is located on the load port "Varna - East." Under the new Master Plan, it will be moved inside in the Varna Bay and released land is intended for new maritime station, marina and park area with public access. To solve the problem of insufficient length of the current service wharf building situated on one of the piers of the released cargo port. Length of the new pier can serve up to two cruise ships simultaneously. New location on the Station cuts distances to bus stops, easy access to the building and connections to the city center.My main idea in a functional solution for passenger service on the second level, consistent with the height of the passenger entrance / exit. Approach to building and infrastructure connection is via ramps located in height over the park. Thus avoiding crossing the path of movement of the passengers and the path of movement of the strolling in a park. Of the space of the park is developed under the building and thus the movement of passengers not disturb the free movement of people in the park.My concept of spatial design recreates the relationship of the building with the sea. The impact of the marine station at the water surface finishes in compositional terms, and overall appearance. In view of the park, the shape of the building creates a sense of orientation to the city, complete with its water reflection. Seen from the incoming ship and the sea gives an impression of entrance gate to the city. The shape of the building allows servicing of vessels on both sides of the pier.Main function of the building is the area to serve passengers. Additional functional areas are serving-service area, conference area, area caterers and traffic kula.Zonata service passengers are divided into two main parts - service on cruise ships and service to smaller korabi.Obsluzhvaneto passenger cruise ships going the second level, as passenger traffic is divided into incoming and outgoing. Access to this area is via ramp, located above the park, as is provided for pedestrian and vehicle access.Service area of the smaller cruise ships is located on level 0 (elevation pier).Additional functional areas are: service access area, part conference, area caterers and traffic tower.Official service areaBetween the service area on cruise ships and service area into smaller cruise ships is located service access area. From here it loading area caterers. On this level is the entrance to the traffic tower.Elevation of 6.00, just above the service area of the smaller cruise ships is located in Port Administration.Conference partIncreasingly, Varna became a venue for business meetings and conferences, as a part of the business people prefer shipping, and organizing business trips by sea. This raises the need to have a conference room in the building of the harbor station. I have deployed this room in front of the building. Access to the hall of incoming passengers from cruise ships going through vertical communication linking the arrival area and the park.Area cateringPublic catering area is freely available for both passengers and for outsiders. It is situated in front of the building, above the conference room at elevations 10.00, 14.00 and 18.00.Traffic TowerPilot Service is located in the highest part of the V-shaped tower, it is consistent with the statutory requirements for high traffic tower. The building is made of steel construction. Volume of the building represent spatial farms. Traffic tower works as a console as ensuring the necessary depth of foundation.The main functional volume of the Sea is filled with suspended glass facade the building will be protected from excessive sunlight form via grid located in front of the curtain wall. In place of the sleeve will be able to open the glazing, and thus they bezprepyadstveno can contact the vessel. The cover traffic tower facade is also, in its lower parts are compact elements, and in the high - transparent, which visually lightens the structure.
Participation of future co-investor, at least 50-80%
For more information.
http://www.tampers.eu/Port-Varna.html
or
http://www.remtechstroy.eu/en/contacts

Send your message to this supplier

*From:
To:
REMTECHNOLOGY
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now