seline;">good performance gypsum powder production line/manufacturing plantThe spiral conveyor will send the calcined gypsum powder to silo for storage, and cool the powder during the process. The dust remover is on the top of silo, the unqualified part will be sent to grinder until it's qualified.
The stored gypsum will be sent to product storage through steel impeller feeder, spiral conveyor, hoist, and send the qualified gypsum powder to storage or workshop finally.The top pulse bag-type dust remover will collect dust from crusher, particle silo. When the dust and dust gas get into the dust remover through inlet, the big-size dust particle will fall because the increasing size and decreasing wind speed. The small dust particle will be filtered by filter bag. The filtered gas will be got rid of by outlet.
2.Parameter of full automatic gypsum powder calciner Controlling PartFull Automatic Annual capacityCustomized (30, 000-300, 000 Tons Per Year)Calcining systemEbullition furnaceRotary kilnFuelNatural gas, diesel, coal, heavy oilRaw materialNatural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Dephosphorization GypsumFinished powder usageGypsum boardPlaster powderSetting timeThe Initial Setting Time: Shall Not Be Less Than 6 Minutes (Adjustable)
The Final Setting Time: Shall Not Be More Than 10 Minutes (Adjustable)
FAQ
FAQ
How is the quality of your products?
Our products are manufactured strictly according to national and international standard, and we take a test on every grinder before delivery.
Guaranteed
If products’quality is not consistent with the description as we described or the promise before you place order, the guarantee period time is one year.
How about price?
Yes, we are factory and be able to give you the lowest price than market one, and we have a policy that “ for saving time and absolutely honest business attitude,we quote as low as possible for any customer, and discount can be given according to quantity”.
Service and Payment Terms?
A. We usually accept T/T, L/C;
B. T/T: 30% in advance as down payment, the balance before delivery;
C. We take pictures of finished products before delivery.
Contact us