Business Type:
Manufacturer/Factory
Business Range:
Polyurethane Sealant, Silicone, Epoxy, AcrylicOwnershipPrivate OwnerTotal Employees11 - 50 PeopleTotal Annual RevenueconfidentialYear Established2010Certifications(1)ISO9001Product Certifications(1)SGS
Establishment:
2010
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Shanghai Sepuna Chemical Co.,Ltd is a subcompany of PUNADE INTERNATIONAL GROUP, Sepuna is a professional industry adhesive supplier ,manufacturing polyurethane/silicon/epoxy sealant and adhesive,has n...

1
    YRS
General Supplier
Supplier Homepage Metallurgy, Chemicals, Rubber & Plastics Chemicals Adhesives & Sealants Fast Curing Polyurethane Sealant for the Cracks Repair of Cement Concrete Pavement road crack repair sealant

Fast Curing Polyurethane Sealant for the Cracks Repair of Cement Concrete Pavement road crack repair sealant

Get Latest Price
Min. Order / Reference FOB Price
10 Kilograms US $3.00/ Kilograms
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: zero-sl
CAS No.: 9009-54-5
Other Names: polyurethane joint sealant
MF: CH3H8N2O

Product Description
Fast Curing Polyurethane Sealant for the Cracks Repair of Cement Concrete Pavement



ZERO-SL PU310
Eco-friendly Self-leveling Sealant


One component polyurethane with lasting elastic joint material.



KEY FEATURE
Odorless, Eco-friendly, No Harm to the Builder, Excellent Waterproof, Best Sealing, Bright Color

1. One component
2. Self-leveling, can be pouring
3. Durable flexibility
4. High elastic, colorful
5. The new and used sealant has good compatibility, easy to repair
6. Excellent water resistant, oil resistant, acid and alkali resistant, resistance to puncture.

Technical Data
PROPERTY
STANDARD/UNITS
VALUE
Main raw material
-----
Polyurethane
Appearance
Visual inspection
grey, uniform sticky liquid
Density
g/m3
1.35±0.1
Solid content
%
>99
Surface dry time
hour
≤3
Tack free time
hour
3
Fully cured time
hour
3~5
Elastic recover rate
%
99
Elongation at break
%
600
Application temperature
°C
5~35
Service temperature
°C
-40~+80
Shelf life
month
9
Construction Step
1. Cleaning:The substrate surface must be solid, dry and be clean.Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning, blowing, and so on.

2. Operation:Put the sealant into the operating tool, then injecting it into the gap.3. Reservation gap:The construction joint will expand as the temperature change,so the surface of the sealant should be lower than 2mm of the pavement after construction.4. about maintenance time: At the standard state, the maintenance time is about 5 hours. It depends on the actual construction conditions. The standard state is that the temperature is 23±2℃, and the humidity is 55 ± 5%RH.5. Operation Methods: Because the packing is different, the construction methods and tools are slightly different. The specific construction method can be checked in by www.zero-sl.com

Our Company
Packing & Shipping
Certifications
Cooperation Partners

Send your message to this supplier

*From:
To:
Shanghai Sepna Chemical Technology Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now