Recycling Aluminum Concrete Construction Formwork - Buy Concrete Formwork,Formwork Concrete,Construction Formwork Product on Alibaba.comModular New Aluminum Concrete System Slab Beam FormworkAdvantages of aluminum template:
NO.1:The construction efficiency is high and the cycle is short, convenient construction, repeatability, ease of use, and low cost.
NO.2: It has well stability and high bearing capacity,Carrying capacity can reach 60KN per square meter.
No.3: It also has a wide application scope,Aluminum formwork system is applicable to all building components.
NO.4: Good effect of concrete surface after removal the model.Don't need for plastering, can save two times the cost of plastering.
NO.5:Site doesn't have produce construction waste, It's more safer ofconstruction.
NO.6:The design of a molding with high precision and practical.Very suitable for the standard layer of high-rise, high-rise buildings.
NO.7:Aluminum alloy material can be recycled,All materials are renewable materials, energy saving, environmental protection, low carbon, emission reduction.
NO.8: Less of the Support system, easy to walk. Material
6061-T6Aluminiumalloy
MainComponents
Beam,Column,Wall,Prop,Others
SafeWorkingLoad
60KN/m2
Size
Non-standard:custom-madeasperbuy’srequirements
Capacity
20000 sqm per month
Applications
Exhibitionsetup;Interiorrefurbishing;
Interiorrefurbishing
Allthetowerscanbeconnectedtogetherformulti-purpose
FREQUENTLY ASK QUESTIONS:(If your questions are unlisted on below, plsClick hereto let us know.)-Q-:Do I use this set of formwork to another project?
A: There are nearly 70% standard panels can be common use.
-Q-:What's your packing methods?
A: protection foam+heat contracted plastic film. / wooden packing / metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C100%, or negotiateaccording to the order status
-Q-:Are you manufacturer or trader?
A: We are the munafacturer of aluminum formwork system. Our group company has 4 factories, coveraged every scaffolding systems.
-Q-:If I don't have people know well about your forwmork system?
A: We will send 2 or more technicists to your construction site for guidance.
-Q-:Do I use this set of formwork to another project?
A: There are nearly 70% standard panels can be common use.
-Q-:How to proceed an order for aluminum formwork?
A: 1- All your drawings send to us.
2- After analyze by our engineer and designer, we have a meeting for discussing details.
3- Construction details /confirm/ied, contract signed.
4- Modeling.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance check.
8- Ship.