high construction efficiency aluminium concrete formwork system
Template Advantage:
1. Lightweight, high construction efficiency .
Because of the characteristic of the light weight aluminum formwork, manual handling, greatly speeds up the construction progress, improve the construction efficiency .
2. Good stability, high bearing capacity .
The stability of the formwork which consistby the aluminum alloy template is very good. The bearing capacity is 60kn/m2.
3. Turns more and good economic benefit .
A template can be used more than 300- 500 times , and the cost of per square meter is 229.5-262.3$ , so, the amortized cost is 0.49 $ per square meter.
4. High recycling value.
Scrapped template hashigh recovery value, amortizing the cost obviously (about66 $ per square meter).
5. Wide scope of application.
Usedin reinforced concrete field : wall , post, beam, bridge,etc. Material
6061-T6Aluminiumalloy
MainComponents
Beam,Column,Wall,Prop,Others
SafeWorkingLoad
60KN/m2
Size
Non-standard:custom-madeasperbuy’srequirements
Capacity
20000 sqm per month
Applications
Exhibitionsetup
Interiorrefurbishing
Allthetowerscanbeconnectedtogetherformulti-purpose
FREQUENTLY ASK QUESTIONS:(If your questions are unlisted on below, plsClick hereto let us know.)-Q-: Do I use this set of formwork to another project?
A: There are nearly 70% standard panels can be common use.
-Q-:What's your packing methods?
A: protection foam+heat contracted plastic film. / wooden packing / metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C100%, or negotiateaccording to the order status
-Q-:Are you manufacturer or trader?
A: We are the munafacturer of aluminum formwork system. Our group company has 4 factories, coveraged every scaffolding systems.
-Q-:If I don't have people know well about your forwmork system?
A: We will send 2 or more technicists to your construction site for guidance.
-Q-:Do I use this set of formwork to another project?
A: There are nearly 70% standard panels can be common use.
-Q-:How to proceed an order for aluminum formwork?
A: 1- All your drawings send to us.
2- After analyze by our engineer and designer, we have a meeting for discussing details.
3- Construction details /confirm/ied, contract signed.
4- Modeling.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance check.
8- Ship.