Business Type:
Manufacturer/Factory,Trading Company
Business Range:
iron entry door, iron garage door, iron fence, iron stair railing, iron gate
Establishment:
2018
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Western Europe, Domestic Market
OEM/ODM Service
Sample Available

Mansion is a professional manufacturer only focus on designing and producing custom wrought iron doors and similar iron artwork products. We have a modern factory with well-equipped facilities and ex...

1
    YRS
General Supplier
Supplier Homepage Metallurgy, Chemicals, Rubber & Plastics Environmental Protection Gas Disposal Activated Carbon Adsorption Equipment Activated Carbon Manufacturing Equipment Equipment For Coating

Activated Carbon Adsorption Equipment Activated Carbon Manufacturing Equipment Equipment For Coating

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $3000.00/ Set
Local Area: Xian, Shaanxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: ChengYuan
Purify Efficiency: 95%-98%
Warranty: 1 Year
After-sales Service Provided: Video technical support, Field installation, commissioning and training, Field maintenance and repai
Product DescriptionAdvantages 1.The paint fog processing rate reaches above 85%2.The equipment operation cost reduces more than 50%3.With varieties of models, easy to choose the appropriate type according to the installation site.4.Easier to clean, maintain and check the device5.Almost no welding, can be disassembled6.Minimize package to minimize transportation cost.7.Widely used in the coating industry.8.Can work with original device to reduce upgrade costWarrantyPackaging & ShippingEngineering ExampleCompany InformationOrder ProcessFAQ
Q1. What's MOQ?
1 set
Q2. Can we customize our style, size, color, package?
Yes. Custom orders accepted.
Q3. What information will needed to get a quote?
Cabinet dimensions or layout together with site pictures and order quantity.
Q4. What's production lead time?
It's 25 - 45 days based on order quantity.
Q5. What is your payment terms?
We will accept by T/T 30% before production, the balance should be paid with 5 days after production finished.

Send your message to this supplier

*From:
To:
Mansion (Xiamen) Building Materials Company Limited
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now