Processingtimeforonebatch
No.
Model
FeedingTime
ProcessingTime
CoolingTime
DischargeCarbonTime
DeliveryTime
InstallationandTrainingTime
1
XD/05
1-2Hrs
6-8Hrs
2Hrs
1-2Hrs
30daysaftergettingdeposit
20days
2
XD/06
1-2Hrs
6-8Hrs
2-3Hrs
1-2Hrs
30daysaftergettingdeposit
20days
3
XD/08
2-3Hrs
9-11Hrs
2-3Hrs
1-2Hrs
30daysaftergettingdeposit
20days
4
XD/10
3-4Hrs
9-11Hrs
3-4Hrs
2-3Hrs
30daysaftergettingdeposit
20days
5
XD/12
3-4Hrs
11-13Hrs
3-4Hrs
2-3Hrs
30daysaftergettingdeposit
20days
MachineMotorPower
No.
Model
SpeedReducer
Fan
Blowers
OilPump
WaterPump
1
XD/05
3KW
4KW
1KW
1.5KW
1.5KW
2
XD/06
3KW
4KW
1KW
1.5KW
1.5KW
3
XD/08
5.5KW
7.5KW
1KW
1.5KW
1.5KW
4
XD/10
5.5KW
7.5KW
1KW
1.5KW
1.5KW
5
XD/12
5.5KW
7.5KW
1KW
1.5KW
1.5KW
3. Main features of the Tyre/rubber recycling equipment
>>TheadvantagesofthePyrolysisProcess
Recoveredvaluablematerials:
Rawmaterial
Bigtyres
Cartyres
Bicycles&motorcycletyres
Oilyield
45%-50%
40%
30%-35%
Steelwire
15%-20%
10%-15%
5%-10%
Carbonblack
30%
45%
45%
Wastegas
5%-10%
5%-10%
5%-10%
*Thespecificratesubjectstotherawmaterialsused.Pleasecontactusfordetails.
>>Structureandprinciple
*wholeparts
Thewholepyrolysissystemiscomposedby16parts,whicharereactor,Insulationlayer,
Desulfurization,deduster,Draftfan,Chimney,Waterfilmcyclone,Condenser,Watertank,
Coolingtower(optional),Gasrecyclesystem,Oiltank,Gasseparate,Wastegasburner,Furnace,Blower,Carbon
blackslagsystem.
Thekeysofpyrolysisplantarereactorandcoolingsystem.
*Reactor
Reactordirectlydecidesthemachine'ssafetyandservicelife.Itismadebyweldedsteelplate.
Sothequalityofweldingwillhaveadirectimpactonsafetyandservicelife.Therefore,weuse
automaticweldingmachine,X-raysdetectionandheatingtreatmentwhichwillnotonlyguarantee
thequalityofweldingbutalsogreatlyimproveworkingefficiency.
>>Features
*Safety
Withanautoweldingmachineforthereactor,itcannotonlygreatlyimproveworkingefficiency
butalsoguaranteethequalityofweldingseam,thusavoidexplosioncausedbygasleak.
Professionalheatingtreatmentandx-raydetectionchamberareespeciallyforwelding.
Vacuumsystemwillpreventoilgasfromgoingbacktoreactorandcausingaccident
Professionalthermometer,pressuregaugeandsafetyvalve.
Itisdangeroustoburnexhaustgas(C1toC4)withoutanysafetymeasures.Inourprocess,itis
transferredfirstthroughthesafetydeviceandasafetyburningairmuzzle.Beforeburning,we
shouldensurethesafetyofproduction.
*Environmentalprotection
Wellwaterdedustingsystemcanavoidblacksmoke.
Theexhaustgaswillberecycledforheatingreactor,nogaspollution
Everyjunctionofthereactorisingoodsealingsituationwithprofessionalsealingmaterial.
*Longservicelife
Material:Q245R/345Rspecialsteelplate,thickness14-16mm
Welding:Automaticweldingmachinewithheatingtreatmentandx-raydetectionwillprolong
theservicelifeofreactortothemax.
Theservicelifeofthereactorwillbe5-6years
*Energysaving
Wellsealingforheatingsystem,nogasleakandsavingfuel.
Theexhaustgaswillberecycledforreactorheating.