Sunrise portable assembly small mini home use biogas plantProduct DescriptionTechnical parameters Digester ModelSR-3M3SR-5M3SR-10M3SR-15M3Digester Dimension L*W*H (mm)1620*1320*17601940*1940*18103880*1940*18105820*1940*1810Weight (kg)6886140182.8Packing volume (m3)0.380.450.640.71Daily gas production (m3)1.52.557.5Effective gas storage capacity (m3)1.5-22.5-35-67.5-9Fermentation effective volume (m3)1.5-22.5-35-67.5-9Waste Treatment Capacity (kg)Food waste3660120180Pig manure4575150225Cow dung65110220330Chicken manure3560120180Vegetable waste68115230345System flowCompany InformationExhibition showCertificationsPackaging & ShippingFAQ
How do we cooperate to build biogas plant ?
Part One: We need the data ofraw materialfrom your side.
1. What’s kind of raw material to be treated by biogas plant?
1.Food waste2. Green waste3. Animal waste4. Human waste
5.Bird waste6. distillery waste water 7. Other
2. How much waste per day?
Please inform us the quantity of the waste per day. We could help you figure out the gas production from the waste per day.And then we suggest the volume of the digester tank.
For example, you could inform us the quantity of the pigs in your pigsty.
We suppsoe there are 500 sow pigs.
Daily Feces of the sow pigs is 3Kg per day. So, 500x3= 1500Kg pig manure per day.
22.23Kg pig manure produce 1 m³ biogas. 1500Kg÷22.23= 67.5m³ biogas.
We would prefer suggest the 150m³ biogas plant for this solution on the condition of 25~30 degrees Celsius.
Part Two: What is the usage of biogas for your project?
1. Cooking 2. Generating eletricity
3. Cooking and Generating eletricity 4. Other
For Generating eletricity, 1m³ biogas produce 1.5KWH eletricity.
500 sow pigs can produce 67.5m³ biogas per day that is produced 101.25KWH eletricity per day. It able to run the 10KW biogas generator for 10 hours per day.
Part Three: We make the proposal for you.
Sunrise Econergy specialize in family size biogas plant and the medium size biogas for farms and schools and factories. We have different recommend to you according to your situation.
Part Four: We guide you to build the biogas plant.
Buyer is responsible for the civil engineering, installation while supplier will be in charge of design, guidance,purchasing equipment and technology service.
According to your own situation, we support the civil engineering drawing of your biogas plant to you when you confirm the order to us. If you are asking for us, we could send the technical personnel to your construction plant at site for the installation guidance.During the service stage, buyer will be responsible for the boarding fee, transportation fee for the technician.