OEM service ABS plastic injection molding productsProduct Description
More than 23 YEARS experience in manufacturing Mould, die casting,stamping,CNC machining,extrusion and plastic injection moulding parts.
Our Advantage:
1. We are a professional OEM manufacturer.
2. We have experienced engineers and quality control team as our strong backing.
3. High quality, competitive price, quick response is our mission.
4. Professional technical support
5. Gooddelivery time
6. Strict quality control process
7. Cost-Effective
8. Rich experience in mould design and production.
9. ISO/ERP system guarantee. MaterialPCApplicationToyDesigns
1.As per the customer’s drawings
2.As per the customer’s samplesDimension
base on the customer’s designSoftwarePro/E, Auto CAD, CAXA UGProductsAll kinds of plastics products: include automotive parts, monitor parts, railroad parts, medical parts, marine parts, lighting parts, pump body, valve parts, architectural parts and furniture parts, and so on Inspection
1.Foundry in-house: 100% inspecton on critical dimension; 100% on appearance.
2.Third Party inspection available upon requirementPackingSingle protective + Carton + Pallet, each carton less than 15KG.PaymentT/T,L/CMore products:More Products
Our equipments
Our equipments:
about us
FAQ
Q1. Are you a factory or trade company?
We are a factory located in 6th Building, No 51, Nanhuan Ave, Gongming, Shenzhen, 518106, China.
Welcome to visit our factory.
Q2. What kind of production service do you provide?
mould making, die casting, CNC machining, stamping, Plastics injection moulding, simple assemblyand various metal surface treatment.
Q3. How about the lead time?
Mould: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001:2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How longshould we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould: 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods: 30% prepaid, balance T/T before shipment.Contact us