Business Type:
Manufacturer/Factory,Trading Company
Business Range:
grounding material, earthing material, motorcycle shock absorber, refrigeration control part, exothermic welding material
Establishment:
2015
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Mid East, Africa, Central America
OEM/ODM Service
Sample Available

We have committed to the design and manfacturing the key spare part of grounding system ,motorcycle and refrigeration system .Currently ,there are 3 professionally product lines :grounding material ,...

1
    YRS
General Supplier

Prices of copper grounding tape

Get Latest Price
Min. Order / Reference FOB Price
50 Meter US $1.00/ Meter
Local Area: Shaoxing, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: TuAn
Material: Red Copper
Grade: Pure Copper, T2
Cu (Min): 99.99%
Product Parameters
Grounding system flat copperbus barcomplies with the International Electrotechnical Commission IEC and CE standards, production technology leading. One grade oxygen-free copper, the copper content of up to 99.97%, the resistivity of less than 0.017241, for the highest standards in the industry. The copper tape is widely used in telecommunications, power, petrochemicals, railways, meteorology, military, computer rooms, and intelligent building lightning protection and grounding project, as a ground material, lightning down conductors, and other potential connections. As a copper strip manufacturer ,we will supply more competitive product .Specification Chemical CompositionC1100: Cu >99.90% C1020:
Cu >99.96% C1220: Cu >99.97%; P 0.015-0.04%Oxygen contentC1100: O < 500PPM C1020: O < 50PPMElectric 20°CConductivityC1100/C1020 >97% ;C1220 >80%Sizecustom madeGradeC1100 / C1020 / C1220 Product Classification about Us Why Chooes Us Transaction Flow Faq1. Are you factory or trader?
We are professional manufacturing factory.2. How to order?
Normally the customer can order our products by Alibaba platform or contact our representative by Email.
After receving your message, our sales will confirm with you about the specification or other required
details then we will send an official invoice to you via mail, which will be included the details of your
order and bank information stamp and signed by manager.3. Do you accept OEM manufacture?
Yes.4. What's your lead time?Generally,the lead time is about 20 days after getting your down payment,the real time depends on your
order condition.5. what's your payment Term?Generally, 30% down payment and the remained should be effected before shipping.6.Where is your nearest port?Ningbo or shanghai, both of them are about 3 hours ride.

Send your message to this supplier

*From:
To:
Xinchang Tuan Machinery Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now

Contact Supplier

Mr. Victor Xie
Sales Department
Sales Manager