Product Description
YM-A2000 Cheap 1 Cavity Automatic PET Water Bottle Blow Molding Making Machine with preform manual loading
Bottle Samples:
Product Application
Type: The automatic blowing machine with preform hand feeding YM-AL 600
Number of cavity: 1cavity. about this series, we also have 2 to 4 cavity.
Production capacity: 800-1400BPH ( 1 cavity)
Application: beverage bottles, mineral water bottles, edible oil bottles, medicine bottle etc.
Machine Main Features:
1. PLC control stable production. Stable Performance
2. The preform was fed by hands, but automatic blow ,automatic take our bottle
3. One worker is enough, easy for operation, without special trainning.
4. High efficiency, energy saving. the 1 cavity blowing machine, output per hour is 800-1400BPH.
It will bring you great benifit.
6. It only take you 5 minutes to replace the mould. Because our mould have the positionng function.
7. Thers is almost no maintain cost.
Detailed Images
Technology Parameter
Company Information
Our Services
Pre-Sales Service
* Welcome to view our Factory.
* 24 hours on line answer your question.
* Help client choose the suitable machine.
* Sample testing support.
* Take video as client's request.
After-Sales Service
* Training how to instal the machine, training how to use the machine for free.
* Warranty: one year
* Engineers available to service machinery overseas.
* We provide useful documents with machine.
FAQ
Q: Are you a factory or trading company?
A: We are a factory .
Q: Where is your factory located?
A: Our factory,near Shanghai, located in Taizhou,China
Q: what is your trade term?
A: normally FOB NINGBO, if customer country requires, also can accept L/C at sight.
Q: what is your payment term?
A: 30% down payment against order /confirm/iation, 70% balance payment prior shipment.
Q: Have blow machine 100% assemnled well in stock?
A: No. All blow machine will be assembly produced according to your order.
Q:what is your delivery time?
A: usually in 45-60days, depends on your projects.
Q: what about installing in customer factory?
A: after machine arrived at your factory, please prepare water, electric,air and preform, then we will arrange engineer to install machine and train your workers, the longest time to free install shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q:guarantee time?
A: one year guarantee, not man-made.
Welcome To Visit Our Company !