Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Robotic Arm, Automation Assembly Machines for Switch, Socket, Motor, Plug, Cooling Fan, Battery
Establishment:
2012
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
Domestic Market, South Asia, Southeast Asia
OEM/ODM Service
Sample Available

Dongguan Yicheng Automation Equipment Co., Ltd. was engaged in developing and manufacturing the industrial automation equipment. Since it was established in Ninetys, Yicheng devoted itself into produc...

1
    YRS
General Supplier

Production Line for Circuit Breaker MCB Assembly Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $40000.00/ Set
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: YICHENG
Place of Origin: Guangdong, China
Brand Name: YICHENG
Condition: New

Breaker Production Equipment Assembly Machine for Breaker Automatic Assembly Line
Product Description
Function-Engine Assembly Line:
PLC control system, automatically complete material feeding and assembling; such as wall switch bottom cover, the positive and negative terminal, ground terminal, wing panels, spring, spring fittings, buttons, terminal screws and other parts.
Application-Engine Assembly Line:
Apply to electrical switches production areas to achieve automated assembly of wall switch.
Technical parameters: Product Name:Engine Assembly LineProduction capacity: 20 ~ 25pcs / minDriving pressure:4.5 ~ 6.5kgf / cm2Operating voltage:110V ~ 250VFeeding mode:vibratory bowl feeder Dimensions:5400 (L) X1600 (W) X1600 (H) (mm)Weight: about 4000kg
Machine Structure-Engine Assembly Line:
1 Electronic control: Taiwan Weinview touch screen, PLC control;
2 Gas into components: AIRTAC brand cylinder drive, Panasonic or Keyence optical fiber sensor;
3 Two to four vibrator automatic feeding rubber core, terminal, vibration plate painting, baking rack side pass;
4 Structure sliding part choose D2 high speed steel, stable wear, good fixity;
5 One year warranty;
6 Alarm indication;
The machine features-Engine Assembly Line:
1 This series machine is designed and manufactured specifically for the switching industry
2 Automatic feed terminal, loaded terminal / riveting / one-time processing complete
3. Automatic detecting, automatic start when there is material detected, and auto stop when lack of material
4. Automatic counting, set output
5 using the touch screen, intuitive interface, simple and safe operation,
6 automatic alarming in case of abnormal shutdown and reporting abnormal information
Hot Sale
Company Information
Our Clients
Packaging & Shipping
Certifications
Back To Home
FAQ
FAQ
1. Are you a factory or trading company?
We are an CE and ISO proved manufacturer specialized in automation equipment R&D and manufacturing in the fields of switchses , motors ,cooling fans , medical and other industrial areas since 2007
2.How can we get the proposal and quotation sheet for automation equipment as our request ?
Pls kindly supply us the following details as below:
2D/3D product drawings.
Capacity request
Samples send to our address for engineer evaluating .
After all information obtained , We will try to send you the proposal for confirmation within one week!!!!!
As soon as you confirm our proposal , we will send you the formal quotation sheet ASAP.
3. Where is your factory located?
Our factory is located in Dongguan,Guangdong,China. Warmly welcome your visit to our factory. As soon as your schedule settle down , we can arrange our driver to pick up you if it's necessary .
4. How long is the warranty of your equipment?
One year warranty after receipt check upon delivery. And we will comprehensively provide you all kinds of technical support services in after-sale ! And also , our engineers are available to service machinery overseas to do help untill the machine is in good performance .
5. What is packing of this machine? Is it suitable for shipment?
Machine will be wrapped with shrink film to avoid any scartches,the outside packed by standard wooden case. It is suitable for shipment. After you receive machine, it's better to carefully check the overall appearance of machine. Your comments back will be highly appreciated .
6. How about payment terms and lead time :
A: 50% deposit upon the contract , balance against check and acceptance before shipping.
B: It's around 70-100days after deposit paid .
(The lead time can be negioated according to specific situations)

Send your message to this supplier

*From:
To:
Dongguan Yicheng Automation Equipment Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now