DZL 3 pass automatic coal biomass fired central heating hot water boiler for greenhouse
DZLseries horizontal type full automatic 3 pass fire tube wet back hot water boiler
Model: CDZL
Power:0.7MW,1.4MW,2.1MW,2.8MW,3.5MW,4.2MW,5.6MW,7MW,10.5MW,14MW
Fuel Type: coal,biomass
Structure:horizontal water-fire tube, single drum
Application:hotel,school,greenhouse,central heating,residential heatingetc. Boiler Model
Power
(MW)
Inlet water temperature
(℃)
Returnwater
Temperature (℃)FuelHeating area M3
Grate
area M3Weight(t)
CDZL0.7-
95-700.79570
coal,
bioomass351.8514
CDZL1.4-
95-701.4957074.52.420
CDZL2.1-
95-702.19570106.42.824
CDZL2.8-
95-702.895701294.628
CDZL3.5-
95-703.59570135.46.231.5
CDZL4.2-
95-704.29570148.37.337
CDZL5.6-
95-705.6957019310.449
CDZL7-
95-707957025312.862
CDZL10.5-
95-7010.5957032717.988
CDZL14-
95-7014957075521.1129
Henan Zhong Tian Wei Neng Boiler Co., Ltd.
The company founed in July 2005; located at the east side of Yangxia road, the industry cluster district of Taikang country, Henan province. With years accumulation development,our company has all kinds of advanced processing equipment...
Q: Are you a factory?
A: Yes,we are.
Q: The brand of burner?
A: The brands of burner are Italy Baltur, Rellio, etc.
Q: The warranty time?
A: Three years for the boiler body,two years for the spare parts.
Q: How can you get the best price quickly?
A: Pls kindly confrim the capacity,pressure ,fuel .Then advise your name ,email or whatsapp,skype ,wehcat.
We will offer our quotation to you asap.
Q: What about the installation?
A: When the boiler arrives , we will guide you to make some preparation for installation;
If necessary, our expert will go and finsih the installation,training, trial operation.
Q: How long of the boiler work life?
A: Normally the boiler is designed for 20 years , while if with right operation and good maintenance,the boiler can be used for 20-25 years.