Corrugated drain pipe extrusion line
Product Description
Application4-9
9-32
16-50
Main Machine Model
SJ-30
SJ-45
SJ-65
Screw L/D
25: 1
22: 1
22: 1
Production Capacity(kg/h)
10
40
60
Main Motor (kw)
5.5
15
18.5
Molding machine Power(kw)
1.1
1.5
2.2
Pair of Modules
42
50
50
Production Speed(m/min)
6-10
8-12
8-12
Configuration
No.
Model
Qty
1
Feeder
1set
2
Single-screw extruder
1set
3
Corresponding Single-wall Corrugated pipe extruding die
1set
4
Single-wall Corrugated Pipe Molding Machine
1set
5
Reeling Machine
1set
6
Meter Recorder
1set1. Our factory is located in Jiangsu Zhangjiagang which is nearby Shanghai.
2. We are specialized in all kinds of plastic machines, and we have been in this area for many years so we have a rich experince, we can solve most trouble other factory can not.
3. With wide experience, we can design machine for you which will not change its quality.
4. To expend foreign market and seeking for long term cooperation, we will give you a very cheap price.
Packaging & Shipping
All the machine will be packed by standard wooden box.
Our Services
1. We provide one year warranty for all the accessories free.
Company Information
FAQ
1. Q: If I need the machine urgently, what will you do?
A: We have some machines in our warehouse, if the machine match your demands, we can ship the machine to you within 7days after testing.
2. Q: If my machine can not work when I receive it, what will your factory do?
A: First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. Q: If my machine is broken within one year, what your factory will do?
A: Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
4. Q: How can I believe your factory and machines.
A: We have CE, ISO certificates. And we have customers all around the world, we can test the machine after it finished and you check, if it can not reach your demands, we will change, or even give back your deposit.
5. Q: How many days needed to finish the machine and what is about the payment?
A: Normally we use T/T payment. And normal machine need 30 working days. If we have the same machine in storage, it can be finished with 7 working days.