Business Type:
Manufacturer/Factory,Trading Company
Establishment:
2008
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Europe
OEM/ODM Service
Sample Available

Cang Long Group was established in 2008.Our group owns the international market department, the domestic market department, the R &D department and tow group modernized Processing Center, covering the...

1
    YRS
General Supplier
Supplier Homepage Home, Lights & Construction Construction & Real Estate Real Estate Steel structure for Office Building and Public buildings

Steel structure for Office Building and Public buildings

Get Latest Price
Min. Order / Reference FOB Price
30 Ton US $550.00/ Ton
Local Area: Zhengzhou, Henan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: Canglong
Model Number: Office Building
Use fixed number of year: 50-100years
Structural form: The steel frame structure

Building description:
Steel structure building is the scope of the current global environmental protection is an architectural pattern, its advantages are mainly embodied in the sustainable utilization of construction waste, the seismic level is high, fast building speed, high utilization rate of materials circulation.
Application feild :
Steel structure is widely used in industrial plants, public buildings, office buildings, residential buildings, farms, stadium, airport, railway station, large span structure etc..
Machining process:
1. The purchase of raw materials
According to the design drawings requirements for procurement of different specifications of steel.( Steel plate or Section steel or Steel pipe..)
Steel plate Section steelSteel pipe Other steel
2. Cutting
According to the design drawings for raw material cutting, punching.
CNC flame cutting CNC drilling
3.Material molding
According to the requirements of the drawings, to cut a good material for forming groups, then finished correction.
Assembly molding Correcting
4.Parts assembly
According to the requirements of the drawings, the parts assembled all the components in the component to the semi welded on.
Automatic welding Half finished product assembly completed
5.The components and quality control of welding
The semi-finished products components and tonic welding quality inspection.
6. Anticorrosion treatment
On the qualified member blasting processing, spray coating of the component derusting pass.
7.Component packing
The pack component quality and integrity of the coating.
Sincerely invite you to visit and order of our company, I will wholeheartedly give you the highest quality service and the best quality products!
You are welcome to come China!

Send your message to this supplier

*From:
To:
Henan Canglong Steel Structure Engineering Co., Ltd.
*Message:

Enter between 10 to 1,000 characters.

*Email code:
This is not what you are looking for? Post a Sourcing Request Now