15 MW Condensing Steam Turbine used for coal fired power plant
Packaging & Shipping
FAQ
Q: How to get a Quote?
A: Please provide the working condition of steam turbine before discussion:
a. Inlet steam temperature, inlet steam pressure, inlet steam capacity
b. Extracted steam temperature, extracted steam pressure, extracted steam capacity (Optional)
c. Rated power(optional)
c. Voltage and Frequency
d. Outlet steam pressure, temperature and flow (if requiring Back Pressure Turbine)
Q:How long is your delivery time?
A : From 5-8 month
Q: What is the term of payment?
A : 30%T/T , 35%T/T, 35% of Balance