Products Detail
SHBD1000 hydraulic plastic butt fusion welding equipment
SHBD1000 BUTT FUSION WELDING MACHINE
Our advantage:
1) CE, SGS, ISO9001 certificate
2) Provide on line video technique teaching of fusion welding
3) 2 years warranty
4) Provide customized welding machine
Brief introduction of SHBD1000 BUTT FUSION WELDING MACHINE
1) Suitable for welding of plastic pipes and fittings made from PE, PP & PVDF.
2) Easy to use
3) Welding position can transform that it is convenient for welding all kinds of pipe fittings.SHBD1000 BUTT FUSION WELDING MACHINE
1. The raw material of the machine frame is aluminum ZL104, it is light but strong, is one of the best material for machine.
2. Lower start-up pressure make the small diameter pipe weld more reliable.
3. Welding position can transform that it is convenient for welding all kinds of pipe fittings.
1.Using Teflon coating material imported from Japan, after twice coating and three processes.
2.The solid core of the Heating plate is thickened and non-stick tube, the heat transfer is even, supporting the aviation connection line to ensure the contact safety of the power supply.
3.Compared with other manufacturers, the thickness of Heating plate is increased by 5mm, and the heat storage and thermal conductivity are strong.
1. High power milling cutter, mirror cutter disk, strong motor, high concentricity, smooth milling.
2. High-power Bosch drill is adopted for milling motor, which is strong and strong without slipping
3. The milling cutter is equipped with a limited position switch, which can be rotated only when placed in the frame to prevent accidental injury.
1. Timer, pressure gauge, temperature controller and alarm shall be installed on the operating table to facilitate observation and improve welding efficiency.
2. The temperature controller and pressure regulating valve are CE certified, and the control precision can reach 0.01%.
3. The hydraulic station is installed with an accumulator, which can realize the function of automatic pressure replenishment and reduce the number of manual pressure replenishment.
Why choose us
1) Advanced laboratory
2) Mature fusion welding technology
3) Spare parts warehousing quality inspection, inspection during the production process, complete machine inspection and commissioning before delivery.
4) Cooperate with well-known universities, participate in the drafting of GB national standard, provide training for fusion welding technicians at home and abroad, and support free online video guidance.1) Advanced laboratory
2) Mature fusion welding technology
3) Spare parts warehousing quality inspection, inspection during the production process, complete machine inspection and commissioning before delivery.
4) Cooperate with well-known universities, participate in the drafting of GB national standard, provide training for fusion welding technicians at home and abroad, and support free online video guidance.
5) Sufficient spare parts inventory, short delivery time, less than 50 sets, delivery time 7-10 working days, in line with ROHS 2.0 standard.
Related products