Product Description
automated light deprivation greenhouse for sale The blackout greenhosue / light deprivation is simple, cheap cost, easily installation. Its structure is hot galvanized steel which is durable, strong, rust-protection, and has more than 15 years service life. The customers can choose different system, cooling system/heating system/ventilation system/shading system/light system/irragation system, by the climatic condition.
Hot selling size
30' x 100' , 20'x100', 20'x60', or customized size
Covering material
100 micron/120 micron/150 micron PO film
framework
hot dip galvanized tube about for 15 years service life
Length
Customized
Width
6m -12m
Top height
3m -4.5m
Wind Load
0.4KN/m²
Snow Load
0.35KN/m²
Rain fall
140mm/h
plant hanging load
15kg/m²
Detailed Image
framework
Hot galvanized steel framework, durable, anti-rust, more than 15 years service life
Arch: φ 32x2.0mm, or φ32x1.5mm, φ60 x2.0mm
rectangular tube 30x55x2.0mm,
Covering Material
Material: PO, PE, EVA
Thickness: 100 micron/120 micron/150 micron plastic film.
Feature: anti-dew, dust-roof, anti-drip, anti-fog, anti-aging
Ventilation
Side ventilation
Including film roll up machine, nisect net, etc
Blackout shading
The system is installed in greenhouse, fixed on the truss and with the frame of greenhouse.
The transmission consist of A type rack-pinon structure and B-type rack-pinion structure according to the difference of pinions and connection modes.
Cooling system
The cooling pads are installed on one side of greenhouse, including cooling pad, cooling fan, air circulating fan, etc.
Cooling fan: 1380x1380x400mm, input power:1100W, National Volage:380V,Blast Capacity: 44000m³/h
Cooling pad: Normal height:1.5m,2.0m available for customize, 100/150mm thickness, including cooling pad and water supply system
Our Service
FAQ
1) Are you factory?---Yes, we have the greenhouse experience for maor than ten years.2) How long is the delivery time?--- It is about 10 days -60 days after deposit. It depends on the greenhouse size.3) How to install greenhouse?--- We will send our engineers to the clients' site for guiding the installation. Client should hire enough local workers for doing the installation work.4) When installing, what cost should we pay?--- Our engineers' airline tickets, local accommodations, visa fees, etc are taken by the clients. and Our engineers' salary is $100 /day per person.5) What is the payment terms?--- Generally, our payment way is 30%-50% TT deposit, the balance by TT before loading. Or you can give your own payment term, then we can negotiate it.