Contents
1
Equipment type
XD-06
XD-08
XD-10
2
Raw material
tires/Plastic/rubber
tires/Plastic/rubbrt
tires/Plastic/rubber
3
Structural form
Horizontal rotation
Horizontal rotation
Horizontal rotation
4
24-hour Capacity
6 ton
8 ton
10 ton
5
Oil yield
2.7~3 ton
3.6~4 ton
4.5~5 ton
6
Operating pressure
Normal
Normal
Normal
7
Material of reactor
Q345R
Q345R
Q345R
8
Thickness of reactor
14mm/16mm
14mm/16mm
14mm/16mm
9
Rotate speed of reactor
0.8turn/minute
0.8turn/minute
0.8turn/minute
10
Total power
20KW
20KW
20KW
11
Mode of cooling
Water cooling
Water cooling
Water cooling
12
Kind of transmission
Internal gear drive
Internal gear drive
Internal gear drive
13
Noise
≤85
≤85
≤85
14
Size of Reactor(DxL)
2000x6000
2200x6600
2600x6600
15
Working form
Intermittent operation
Intermittent operation
Intermittent operation
16
Delivery time
20days
20days
20days
17
Weight
18~22T
20~25T
25~30T
>> Structure and principle of the Recycled plastic pyrolysis equipment
* whole parts
The whole pyrolysis system is composed by 16 parts,which are reactor,Insulation layer,Desulfurization,deduster,Draft fan,Chimney,Water film cyclone,Condenser,Water tank,Cooling tower(optional),Gas recycle system,Oil tank,Gas separate,Waste gas burner,Furnace,Blower,Carbon black slag system.
The keys of pyrolysis plant are reactor and cooling system.
*Reactor
Reactor directly decides the machine's safety and service life. It is made by welded steel plate. So the quality of welding will have a direct impact on safety and service life. Therefore, we use automatic welding machine, X-rays detection and heating treatment which will not only guarantee the quality of welding but also greatly improve working efficiency.
>> Features
* Safety
With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak. Professional heating treatment and x-ray detection chamber are especially for welding.
Vacuum system will prevent oil gas from going back to reactor and causing accident
Professional thermometer, pressure gauge and safety valve.
It is dangerous to burn exhaust gas (C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
* Environmental protection
Well water dedusting system can avoid black smoke.
The exhaust gas will be recycled for heating reactor, no gas pollution
Every junction of the reactor is in good sealing situation with professional sealing material.
* Long service life
Material: Q245R/345R special steel plate, thickness 14-16mm
Welding: Automatic welding machine with heating treatment and x-ray detection will prolong the service life of reactor to the max.
The service life of the reactor will be 5-6 years
* Energy saving
Well sealing for heating system, no gas leak and saving fuel.
The exhaust gas will be recycled for reactor heating.