General Description of 200L Brewery
------ Quality Design for Craft Brewing
200L 2HL Stainless steel electric heating 2 vessel beer brewing equipment turnkey is often used in small craft breweries or craft brewing bars. The system contains two brewhouse vessels, a mash/lauter tank and a boiling/whirlpool tank. The mashing process and the wort filtration process are completed by one tank, and the boiling and whirlpool processes are completed by one tank, saving equipment costs and floor space. This system usually brews one batch a day. If the second batch of brewing takes at least 14 hours, it can cope with a temporary increase in production and is not suitable for planned multi-batch brewing in one day. According to different fermentation cycles of brewed beer, 4pcs 400L fermenters or 6pcs 200L fermentors can usually be configured, and 4pcs 400L fermenters and 4pcs 200L fermenters can also be configured to meet the needs of various beer types. The system also needs to be equipped with a complete automatic or manual control system, malt milling system, CIP system, cooling system, air system, etc.With ISO TUV SGS, the product meets the GB/CE/PED/ASME standard
Local service in EUROPE, AUSTRALIA ETC
5 Years Warranty for tanks
0 trade risk verified by more than 1100 breweries
Build breweries in 76 countries
19 years experiencePart 1: 100-150kg/hr Malt Milling Unit
100-150kg/hr Malt MillerFlexible AugerMilling Controling CabinetPart 2: 200L Two Vessel/HLT Brewhouse
2HL Mash/Lauter Tun2HL Kettle/Whirlpool Tun2HL Hot Water TankPart 3: Fermentation Unit
400L Fermentation Tank/Unitank200L Fermentation Tank/Unitank400L Bright Beer Tank200L Bright Beer TankPart 4: Glycol Cooling Unit
500L Glycol Water Tank3HP Glycol Water ChillerGlycol Water PipelinePart 5: Electric Control Unit
Control CabinetPart 6: Portable CIP Pump
Sanitary Centrifugal PumpLearn More about TIANTAI COMPANY
------ Your HonEST brewery equipment builder!
Company Information
Our Services
a.) Free consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Free debugging instruction of equipment until everything is functional;
d.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer;
e.) Training of equipment maintenance and operating personally;
f.) New production techniques;
g.) Provide 60 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free;
Packaging & Shipping
Click⇒♦♦♦More Products♦♦♦⇐Click